flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

CCDI, Morphosis, and Diller Scofidio + Renfro are among ten finalists vying for Chinese Eco-Island design

Designers

CCDI, Morphosis, and Diller Scofidio + Renfro are among ten finalists vying for Chinese Eco-Island design

The winning firm will design the master plan and central buildings for the man made Haikou Bay island.


By David Malone, Associate Editor | August 16, 2016

Image © GAO Wenzhonglow via ArchDaily.

Just off the Chinese coast of Hainan sits a large patch of brown earth breaking up an otherwise uniform stretch of blue water. While it may be a bit of an eyesore right now, the island, which is named South Sea Pearl Eco-Island, is destined to become a 250 hectare tourist destination complete with homes, hotels, attractions, and a port with enough space for two cruise ships to dock.

But that all comes later.

Right now, the island is as empty as a promise from Charles Ponzi or one of this year’s presidential candidates, and before any construction can actually begin, it needs to be determined who will design the master plan that will transform the island. As ArchDaily reports, that’s where Hainan Airlines Group’s international design competition comes into play.

The competition has been organized by China Building Center, which has selected former Chief Architect of Barcelona and Director of Guallart Architects, Vicente Guallart, to develop the strategic vision for the island. The goal is to create an urban development using the best available technologies with a focus on ecological principles to make a landmark for new urbanism in China, according to Guallart.

10 firms will present submissions and a winner will be selected by a jury comprising Aaron Betsky, Benedetta Tagliabue, Donald Bates, Sergey Kuznetsov, Peter Poulet, Horacio Werner, and Margarita Jover during the last week of August.

The 10 competing firms are:

  • Foster + Partners
  • Morphosis Architects
  • Office of Architecture in Barcelona Carlos Ferrater Partnership
  • Diller Scofidio + Renfrom
  • IROJE Architects & Planners
  • UNStudio
  • KuiperCompagnons
  • The Jerde Partnership Inc.
  • CCDI
  • Boston International Design Group, LLC

After the selection is made, construction on the island is expected to start in 2017. A tentative completion date of 2027 has also been set. Additionally, South Sea Pearl Eco-Island may not be a solitary development. Studies are currently underway to evaluate the region for other possible man made islands and existing islands off the coast of Hainan may follow the lead of South Sea Pearl Eco-Island and become more tourist-oriented.

Related Stories

| Aug 11, 2010

Report: Fraud levels fall for construction industry, but companies still losing $6.4 million on average

The global construction, engineering and infrastructure industry saw a significant decline in fraud activity with companies losing an average of $6.4 million over the last three years, according to the latest edition of the Kroll Annual Global Fraud Report, released today at the Association of Corporate Counsel’s 2009 Annual Meeting in Boston. This new figure represents less than half of last year’s amount of $14.2 million.

| Aug 11, 2010

AIA to Congress: Act now to jump start building sector of economy

Tampa-based architect, Mickey Jacob, FAIA, unveiled the American Institute of Architects’ (AIA) Rebuild & Renew plan for both short- and long-term economic recovery to the House Committee on Small Business at a hearing October 7th.

| Aug 11, 2010

National Intrepid Center of Excellence tops out at Walter Reed

SmithGroup and The Intrepid Fallen Heroes Fund (IFHF), a non-profit organization supporting the men and women of the United States Armed Forces and their families, celebrated the overall structural completion of the National Intrepid Center of Excellence (NICoE), an advanced facility dedicated to research, diagnosis and treatment of military personnel and veterans suffering from traumatic brain injury.

| Aug 11, 2010

Jacobs, HDR top BD+C's ranking of the nation's 100 largest institutional building design firms

A ranking of the Top 100 Institutional Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Walt Disney Family Museum planned in San Francisco

Construction is under way on a new museum dedicated to the man behind the Disney empire. Set to open this fall in San Francisco, the Walt Disney Family Museum will feature 10 galleries, starting with Disney's beginnings on a Missouri farm.

| Aug 11, 2010

SAFTI FIRST hires Tim Nass as National Sales Manager

SAFTI FIRST, a leading USA manufacturer of fire rated glazing and framing systems, is pleased to announce the addition of Tim Nass as National Sales Manager.  In his new role, Tim will be working closely with architects and contract glaziers in selecting the appropriate and most economical fire rated glazing solution for their project.   He will also be coordinating SAFTI FIRST’s extensive network of architectural representatives throughout the United States.

| Aug 11, 2010

NCARB welcomes new board of directors

The National Council of Architectural Registration Boards (NCARB) introduces its Board of Directors for FY10, who were installed during the culmination of the Council’s 90th Annual Meeting and Conference in Chicago.

boombox1
boombox2
native1

More In Category


Healthcare Facilities

Watch on-demand: Key Trends in the Healthcare Facilities Market for 2024-2025

Join the Building Design+Construction editorial team for this on-demand webinar on key trends, innovations, and opportunities in the $65 billion U.S. healthcare buildings market. A panel of healthcare design and construction experts present their latest projects, trends, innovations, opportunities, and data/research on key healthcare facilities sub-sectors. A 2024-2025 U.S. healthcare facilities market outlook is also presented.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021