flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

CBRE's bold experiment: 200-person office with no assigned desks [slideshow]

CBRE's bold experiment: 200-person office with no assigned desks [slideshow]

In an effort to reduce rent costs, the international real estate brokerage firm created its first completely "untethered" office in Los Angeles, where assigned desks and offices are replaced with flexible workspaces. 


By BD+C Staff | October 31, 2013

The idea of shared workspaces is not new. Corporations and institutions have employed "hoteling" concepts for decades.

What's new is the scale of these projects. Large corporations like GlaxoSmithKline and CBRE are implementing "first come first serve"-type workplace concepts across entire floors and buildings—all in an effort to use their space more effectively and, in CBRE's case, reduce rent costs.

The LA Times yesterday reported on CBRE's new 200-person headquarters in Los Angeles, which occupies the top two floors of the 26-story 400 South Hope tower. All 200 occupants, from the executives to the brokers to the admin. staff, work in a completely "untethered" atmosphere, where assigned desks and offices are replaced with a variety flexible workspaces (traditional workstations, small private rooms, conference rooms, lobby space, etc.). The office is designed to encourage interaction and collaboration, with large common areas and collaboration "neighborhoods" (clusters of workstations).

LA Times' Roger Vincent writes:  

"Desktop computers were replaced with laptops that can be stored in lockers in the new office. Upon arriving, employees collect their telephone headsets, laptops and key files. They then head to one of 10 "neighborhoods" where employees doing similar tasks such as legal work or property management cluster. Or they can set up in the heart of the office near the front door that looks like a cross between an upscale hotel lobby and a coffee bar.

Workstations have telephones, keyboards and monitors that employees plug into, and they can sit, stand or even walk on a treadmill while they work. There are media-equipped conference rooms for meetings and small booths for making private phone calls."

Read the full LA Times article.

 

Related Stories

| Aug 21, 2012

Hong Kong’s first LEED Platinum pre-certified building opens

Environmentally-sensitive features have been incorporated, including reduced operational CO2 emissions, and providing occupiers with more choice in creating a suitable working environment.

| Aug 21, 2012

Stellar wins four ABC Excellence In Construction awards

ABC's Excellence In Construction program is the industry’s leading award competition, recognizing outstanding construction projects in a variety of categories.

| Aug 20, 2012

Protecting the artifacts at George H.W. Bush Presidential Library and Museum

Roof leaks threatened to damage artifacts and disturb a delicately controlled indoor environment at the George H.W. Bush Presidential Library and Museum.

| Aug 17, 2012

Ferreri joins PGAL as Principal

Ferreri will be responsible for business development, contract negotiation, project design through construction and staff management/mentoring.

| Aug 17, 2012

Centric Architecture and PLAD Studio merge

The new firm will retain Centric Architecture as its name.

| Aug 15, 2012

MBH Architects announces new appointments

MBH Architects continues to grow, take on new clients.

| Aug 15, 2012

Architects and designers challenged in Allsteel’s reality design competition

KITS mobile app offers flexibility in planning.

| Aug 14, 2012

Leo A Daly welcomes Carl Gentilcore

Gentilcore will be responsible for identifying, developing and managing client relations with key federal government agencies.

| Aug 14, 2012

SOM Foundation announces prize recipients for 2012

Submissions for the SOM Prize were received from students at 34 schools in the U.S.

| Aug 9, 2012

Slideshow: New renderings of 1 WTC

Upon its scheduled completion in early 2014, One World Trade Center will rise 1,776 feet to the top of its spire, making it the tallest building in the Western Hemisphere.

boombox1
boombox2
native1

More In Category




Government Buildings

One of the country’s first all-electric fire stations will use no outside energy sources

Charlotte, N.C.’s new Fire Station #30 will be one of the country’s first all-electric fire stations, using no outside energy sources other than diesel fuel for one or two of the fire trucks. Multiple energy sources will power the station, including solar roof panels and geothermal wells. The two-story building features three truck bays, two fire poles, dispatch area, contamination room, and gear storage.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021