flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

CBRE completes acquisition of Heery International

Contractors

CBRE completes acquisition of Heery International

The deal is expected to expand the real-estate firm’s project management capacities in several U.S. sectors.


By John Caulfield, Senior Editor | November 13, 2017

As part of the new North Terminal Design project at Miami International Airport, Heery International designed new restaurant and retail spaces ranging from 1,500 to 10,000 sf. Aviation is one of the specialties that Heery is bringing to its new owner, CBRE Group. Image: Heery International

Balfour Beatty, the U.K.-based construction company, continued its strategy of selling off non-core assets with its recent sale of Atlanta-based design services and project management firm Heery International to a subsidiary of the real estate and consulting giant CBRE Group.

The October 30 acquisition, for which CBRE agreed to pay an estimated $57 million (42 million British pounds) in cash, was completed today.

Heery was founded in 1952. Balfour Beatty bought a 50% stake in Heery in 1986, and increased its holding to 100% four years later. However, that ownership sometimes precluded Balfour from acting as a project manager and bidding as a GC simultaneously on certain projects in the U.S. Heery’s sale to CBRE removes any conflict of interest from Balfour’s U.S. Buildings operations, and allows it to partner with Heery on future projects.

In 2016, the latest year for which results are available, Heery International had gross assets valued at the equivalent of $106.1 million, and generated pretax profit the equivalent of $3.2 million. It currently operates from 19 U.S. offices with 535 employees. Its services include project management, architecture, engineering, interior design, and commissioning.

CBRE maintains the largest network of professional commercial real estate project managers worldwide. Its more than 5,000 specialists, including 350-plus LEED-certified professionals, oversaw projects with a total contract value of more than $42 billion worldwide in 2016.

 

In a joint venture with H.J. Russell, Heery provided construction management services for Phase I of the Atlanta-Fulton Public Library System's capital improvement program, which entailed eight new libraries (155,000 sf) and two expanded libraries (81,000 sf). Image: Heery International

 

Mike Lafitte, CBRE’s Global Group President-Lines of Business, states that this acquisition should advance his company’s strategy to expand its project management expertise. “Heery has a strong track record of client service with many longstanding relationships spanning decades,“ he says. Lafitte points specifically to Heery’s relationships in the public and educational sectors. This acquisition will also extend CBRE’s reach into such vertical segments as aviation and sports, and add capabilities and expertise in design engineering services.

Ted Sak and Glenn Jardine, Heery’s President/CEO and Executive VP/COO, respectively, will continue to lead Heery under CBRE’s umbrella. 

Related Stories

| Feb 14, 2014

The Technology Report 2014: Top tech tools and trends for AEC professionals

In this special five-part report, Building Design+Construction explores how Building Teams throughout the world are utilizing advanced robotics, 3D printers, drones, data-driven design, and breakthroughs in building information modeling to gain efficiencies and create better buildings. 

| Feb 13, 2014

Why you should start with a builder

They say the best way to eat an elephant is one bite at a time. Expanding your building or constructing a new structure for your business, church, or school isn’t all that different. Attacking it is best done in small, deliberate pieces. 

| Feb 13, 2014

Related Companies, LargaVista partner to develop mixed-use tower in SoHo

The site is located at the gateway to the booming SoHo retail market, where Class A office space is scarce yet highly in demand.

| Feb 12, 2014

First Look: Futuristic Silicon Valley campus designed to draw tech startups

The curved campus will consist of four different buildings, one exclusively for amenities like a coffee bar, bike shop, and bank.

| Feb 11, 2014

Adobe Photoshop update features new 3D printing capabilities

Available as part of an update to Photoshop Creative Cloud, the tool enables users to easily and reliably build, refine, preview, prepare, and print 3D designs.

| Feb 10, 2014

Architecture Design Collaborative announces firm opening in Southern California

Today, Architecture Design Collaborative officially announces the launch of its firm providing a full range of architecture and interior design services nationwide. Architecture Design Collaborative offers architectural design services, comprehensive interior design services, developer collaboration, direct tenant improvement, repositioning and site planning.

| Feb 10, 2014

Ball State to host Geothermal Conference on design, drilling and equipment - April 10, 2014

To best serve the industry, Ball State University has organized a single day conference in which participants will be able to exchange technical notes, develop understandings and share experiences with design, drilling, and equipment issues related to geothermal ground source heat pump technology.

| Feb 7, 2014

DOE, Autodesk team to overhaul the EnergyPlus simulation program

The update will allow a larger ecosystem of developers to contribute updates to the code in order to improve performance and decrease the time required to run energy model simulations.

| Feb 7, 2014

Bernards announces executive leadership realignment

Changes reflect long-term growth plans as builder enters its fifth decade.    

| Feb 7, 2014

Zaha Hadid's 'white crystal' petroleum research center taking shape in the desert [slideshow]

Like a crystalline form still in the state of expansion, the King Abdullah Petroleum Studies and Research Center will rise from the desert in dramatic fashion, with a network of bright-white, six-sided cells combining to form an angular, shell-like façade.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021