flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

CBRE completes acquisition of Heery International

Contractors

CBRE completes acquisition of Heery International

The deal is expected to expand the real-estate firm’s project management capacities in several U.S. sectors.


By John Caulfield, Senior Editor | November 13, 2017

As part of the new North Terminal Design project at Miami International Airport, Heery International designed new restaurant and retail spaces ranging from 1,500 to 10,000 sf. Aviation is one of the specialties that Heery is bringing to its new owner, CBRE Group. Image: Heery International

Balfour Beatty, the U.K.-based construction company, continued its strategy of selling off non-core assets with its recent sale of Atlanta-based design services and project management firm Heery International to a subsidiary of the real estate and consulting giant CBRE Group.

The October 30 acquisition, for which CBRE agreed to pay an estimated $57 million (42 million British pounds) in cash, was completed today.

Heery was founded in 1952. Balfour Beatty bought a 50% stake in Heery in 1986, and increased its holding to 100% four years later. However, that ownership sometimes precluded Balfour from acting as a project manager and bidding as a GC simultaneously on certain projects in the U.S. Heery’s sale to CBRE removes any conflict of interest from Balfour’s U.S. Buildings operations, and allows it to partner with Heery on future projects.

In 2016, the latest year for which results are available, Heery International had gross assets valued at the equivalent of $106.1 million, and generated pretax profit the equivalent of $3.2 million. It currently operates from 19 U.S. offices with 535 employees. Its services include project management, architecture, engineering, interior design, and commissioning.

CBRE maintains the largest network of professional commercial real estate project managers worldwide. Its more than 5,000 specialists, including 350-plus LEED-certified professionals, oversaw projects with a total contract value of more than $42 billion worldwide in 2016.

 

In a joint venture with H.J. Russell, Heery provided construction management services for Phase I of the Atlanta-Fulton Public Library System's capital improvement program, which entailed eight new libraries (155,000 sf) and two expanded libraries (81,000 sf). Image: Heery International

 

Mike Lafitte, CBRE’s Global Group President-Lines of Business, states that this acquisition should advance his company’s strategy to expand its project management expertise. “Heery has a strong track record of client service with many longstanding relationships spanning decades,“ he says. Lafitte points specifically to Heery’s relationships in the public and educational sectors. This acquisition will also extend CBRE’s reach into such vertical segments as aviation and sports, and add capabilities and expertise in design engineering services.

Ted Sak and Glenn Jardine, Heery’s President/CEO and Executive VP/COO, respectively, will continue to lead Heery under CBRE’s umbrella. 

Related Stories

Codes and Standards | Sep 12, 2019

Illinois law sets maximum retainage on private projects

The change is expected to give contractors bigger checks earlier in project timeline.

Multifamily Housing | Sep 12, 2019

Meet the masters of offsite construction

Prescient combines 5D software, clever engineering, and advanced robotics to create prefabricated assemblies for apartment buildings and student housing.

Giants 400 | Sep 11, 2019

Top 95 Industrial Sector Contractors for 2019

Fluor, Clayco, Jacobs, ARCO, and Gray Construction top the rankings of the nation's largest industrial sector contractors and construction management firms, as reported in Building Design+Construction's 2019 Giants 300 Report.

Multifamily Housing | Sep 10, 2019

Carbon-neutral apartment building sets the pace for scalable affordable housing

Project Open has no carbon footprint, but the six-story, solar-powered building is already leaving its imprint on Salt Lake City’s multifamily landscape. 

Giants 400 | Sep 9, 2019

2019 Industrial Sector Giants Report: Managing last mile delivery

This and more industrial building sector trends from Building Design+Construction's 2019 Giants 300 Report. 

Codes and Standards | Sep 9, 2019

Free app calculates maximum allowable heights and areas for buildings

A free app that calculates the maximum allowable heights and areas for buildings of various occupancy classifications and types of construction has been released.

Retail Centers | Sep 6, 2019

Another well-known retailer files for bankruptcy: Here's the solution to more empty anchor stores

Where can you find the future of retail? At the intersection of experience and instant gratification. 

Giants 400 | Sep 5, 2019

Top 85 Hotel Sector Construction Firms for 2019

Suffolk, Yates Companies, AECOM, Swinerton, and Turner top the rankings of the nation's largest hotel sector contractors and construction management firms, as reported in Building Design+Construction's 2019 Giants 300 Report.

Contractors | Sep 5, 2019

Katerra adds two GCs to its stable

UEB Builders and Fortune-Johnson General Contractors specialize in multifamily and mixed-used developments.

Giants 400 | Sep 4, 2019

Top 90 K-12 School Sector Construction Firms for 2019

Gilbane, Balfour Beatty, Turner, CORE Construction, and Skanska lead the rankings of the nation's largest K-12 school sector contractors and construction management firms, as reported in Building Design+Construction's 2019 Giants 300 Report.

boombox1
boombox2
native1

More In Category



Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021