flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

'Catalyst' will be Washington’s first CLT office building

Office Buildings

'Catalyst' will be Washington’s first CLT office building

Katerra is the design builder for the project with Michael Green Architecture as the design architect.


By David Malone, Associate Editor | September 25, 2019
Catalyst exterior

All renderings courtesy Katerra

Catalyst, a 150,000-sf building that will connect to an energy resource sharing eco-district planned for development, will be the first office building in Washington to be constructed out of cross-laminated timber (CLT).

The goal of the building is to demonstrate the possibilities of the integration of economic vitality, regional sustainability, and energy efficiency by leveraging the industries of the region and the innovation happening in the construction and education sectors. Catalyst will include sustainable features such as a gray water system for rainwater recovery, low flow plumbing, shower rooms to encourage commuting by bike, an efficient radiant heating/cooling system throughout the building, heat recovery of all exhaust air, a high performing building envelope design, LED lighting, and sun shading at the lobby.

Eastern Washington University will be the building’s primary tenant. The university will move its Computer Science, Electrical Engineering, and Visual Communication Design programs from its Cheney campus to the new Catalyst building. The CLT for the project is being manufactured in Katerra’s — Catalyst's design builder — new Spokane CLT factory. Michael Green Architecture is the design architect for the project.

 

Catalyst entrance

 

Catalyst interior

 

Catalyst cross section

 

Tags

Related Stories

Office Buildings | Feb 15, 2019

Vancouver’s new office building will be a stack of reflective boxes

OSO and Merrick Architecture designed the building.

Office Buildings | Feb 11, 2019

Real-world wellness pays off

3form, a materials manufacturer, did a top-to-bottom remodel of its Salt Lake City headquarters campus that included adding a 14,500-sf gym.

Office Buildings | Feb 5, 2019

Duluth Trading Company moves to new HQ building

Plunkett Raysich Architects designed the project.

Office Buildings | Jan 11, 2019

Open offices are bad!

The Harvard studies on the unintended effects of open office defines it as space where 'one entire floor was open, transparent and boundaryless… [with] assigned seats,' and the other had 'similarly assigned seats in an open office design, with large rooms of desks and monitors and no dividers between people's desks.'

Office Buildings | Dec 18, 2018

Google announces new $1B Hudson Square campus project

The 1.7 million-sf campus will expand the company’s New York City presence.

Office Buildings | Dec 13, 2018

Apple selects Austin for $1 billion campus

The company will also build smaller expansions in six other U.S. cities over the next three years.

Office Buildings | Dec 4, 2018

Brookfield launches contest for startups to receive two years of free office space

This is part of a larger campaign to burnish the image of L.A.’s Wells Fargo Center. 

Office Buildings | Nov 28, 2018

Amazon HQ2 and the new geography of work

The big HQ2 takeaway is how geography and mobility are becoming major workplace drivers.

Office Buildings | Nov 13, 2018

Amazon selects HQ2 cities

Both cities are on the East Coast.

boombox1
boombox2
native1

More In Category

Adaptive Reuse

Detroit’s Michigan Central Station, centerpiece of innovation hub, opens

The recently opened Michigan Central Station in Detroit is the centerpiece of a 30-acre technology and cultural hub that will include development of urban transportation solutions. The six-year adaptive reuse project of the 640,000 sf historic station, created by the same architect as New York’s Grand Central Station, is the latest sign of a reinvigorating Detroit.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021