flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

'Catalyst' will be Washington’s first CLT office building

Office Buildings

'Catalyst' will be Washington’s first CLT office building

Katerra is the design builder for the project with Michael Green Architecture as the design architect.


By David Malone, Associate Editor | September 25, 2019
Catalyst exterior

All renderings courtesy Katerra

Catalyst, a 150,000-sf building that will connect to an energy resource sharing eco-district planned for development, will be the first office building in Washington to be constructed out of cross-laminated timber (CLT).

The goal of the building is to demonstrate the possibilities of the integration of economic vitality, regional sustainability, and energy efficiency by leveraging the industries of the region and the innovation happening in the construction and education sectors. Catalyst will include sustainable features such as a gray water system for rainwater recovery, low flow plumbing, shower rooms to encourage commuting by bike, an efficient radiant heating/cooling system throughout the building, heat recovery of all exhaust air, a high performing building envelope design, LED lighting, and sun shading at the lobby.

Eastern Washington University will be the building’s primary tenant. The university will move its Computer Science, Electrical Engineering, and Visual Communication Design programs from its Cheney campus to the new Catalyst building. The CLT for the project is being manufactured in Katerra’s — Catalyst's design builder — new Spokane CLT factory. Michael Green Architecture is the design architect for the project.

 

Catalyst entrance

 

Catalyst interior

 

Catalyst cross section

 

Tags

Related Stories

Office Buildings | Apr 5, 2021

FXCollaborative selected to create new lobby, amenity space for 3 Times Square

FXCollaborative designed the original building in 2001.

Office Buildings | Apr 5, 2021

Innovation One completes at University Research Park in Madison, Wis.

Valerio Dewalt Train designed the project.

Office Buildings | Mar 30, 2021

WELL Institute certifies a gigantic office complex with its highest health and safety rating

Poland’s Olivia Business Center one of the first to install ion air purification devices.

Office Buildings | Mar 26, 2021

Finding success for downtown office space after COVID-19

Using the right planning tools can spur new uses for Class B and C commercial real estate.

Office Buildings | Mar 24, 2021

JEA Headquarters tops out in Jacksonville

The building has recently topped out.

Energy Efficiency | Mar 23, 2021

ASHRAE’s new headquarters walks the talk about net-zero energy

The conversion of a 1970s’-era building demonstrates how older structures can be made more efficient and sustainable.

Office Buildings | Mar 16, 2021

Perkins&Will unveils design of its New York Studio

The studio supports hybrid work models with agile layouts and integrated broadcast technologies.

Laboratories | Mar 10, 2021

8 tips for converting office space to life sciences labs

Creating a successful life sciences facility within the shell of a former office building can be much like that old “square peg round hole” paradigm. Two experts offer important advice.

boombox1
boombox2
native1

More In Category

Adaptive Reuse

Detroit’s Michigan Central Station, centerpiece of innovation hub, opens

The recently opened Michigan Central Station in Detroit is the centerpiece of a 30-acre technology and cultural hub that will include development of urban transportation solutions. The six-year adaptive reuse project of the 640,000 sf historic station, created by the same architect as New York’s Grand Central Station, is the latest sign of a reinvigorating Detroit.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021