Historic Carnegie Hall in New York City is in the midst of a major $200 million renovation that will bring the building up to contemporary standards, increase educational and backstage space, and target LEED Silver. The Studio Towers Renovation Project will add a new 61,000-sf education wing across the upper floors of the South Tower, and will include new ensemble rooms, practice rooms, teaching studios, and a research room for the institution’s archives. Backstage areas will increase from three floors to six, and access to a stage left entrance will be restored. Another addition includes a rooftop terrace, first envisioned by the building’s original architect in 1892, but never added. The project includes iu + Bibliowicz Architects, Auerbach, Pollock, Friedlander (theater designer), and Tishman (CM). Completion is anticipated in 2014.
Related Stories
| Apr 10, 2013
6 funding sources for charter school construction
Competition for grants, loans, and bond financing among charter schools is heating up, so make your clients aware of these potential sources.
| Apr 10, 2013
23 things you need to know about charter schools
Charter schools are growing like Topsy. But don’t jump on board unless you know what you’re getting into.
| Apr 9, 2013
FMI predicts 8% rise in construction put in place for 2013
FMI, the largest provider of management consulting and investment banking services to the engineering and construction industry released today its Q1-2013 Construction Outlook. The forecast for total construction-put-in-place for 2013 continues to show an increase of 8% over 2012 levels.
| Apr 8, 2013
Most daylight harvesting schemes fall short of performance goals, says study
Analysis of daylighting control systems in 20 office and public spaces shows that while the automatic daylighting harvesting schemes are helping to reduce lighting energy, most are not achieving optimal performance, according to a new study by the Energy Center of Wisconsin.