flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

CannonDesign launches REALIZE Life Safety Solutions

Building Team

CannonDesign launches REALIZE Life Safety Solutions

“The Final Rule presents a considerable update to the life safety directives most healthcare systems have become accustomed to,” says Joe Cassata, principal at CannonDesign.


By CannonDesign | January 6, 2017

Photo courtesy CannonDesign

In response to changes to the Centers for Medicare & Medicaid Services (CMS) Life Safety Code, CannonDesign has launched REALIZE Life Safety Solutions — a suite of services and software solutions focused on helping healthcare facilities teams assess their compliance with life safety code standards related to CFR 482.41 — Condition of participation: Physical environment — without operational disruptions.

Named the No. 4 facility management provider within an A/E firm by the “World Architecture 100,” CannonDesign created REALIZE Life Safety Solutions to help clients navigate through CMS’s most recent Final Rule, which adopted the National Fire Protection Association’s 2012 edition of the Life Safety Code (NFPA 101), as well as provisions of the NFPA’s 2012 edition of the Health Care Facilities Code (NFPA 99). All health facilities that participate in Medicare and/or Medicaid must comply with these code changes.

“The Final Rule presents a considerable update to the life safety directives most healthcare systems have become accustomed to,” says Joe Cassata, principal at CannonDesign. “The last time a change in the Life Safety Code was made was in 2003 when CMS adopted the 2000 edition. Sorting through the new changes and understanding how they apply to individual facilities is a daunting task, which is why we’re launching this offering.”

With experience assessing more than 200 million SF of space, life safety is not a new service area for CannonDesign. However, REALIZE Life Safety Solutions packages the firm’s life safety services into an easily customizable offering focused on three primary areas:

 

  1. Life Safety Current State: Life safety drawings review, field verification, and key findings report of current Life Safety for owned or leased facilities.
  2. Code Review: Review and report of physical conditions based on 2012 Life Safety Codes.
  3. Corrective Action Plan: Corrective action report containing prioritized deficiencies, cost estimates and recommendations for remediation.

 

“Most health systems have received a life safety deficiency,” adds Cassata. “Sometimes the deficiencies are minor and easily fixed, while other times they require significant facility modifications to prevent steep fines, possible terminated Medicare/Medicaid reimbursements, and even possible closure. Regardless of the scenario, we have the knowledge and expertise needed to get our clients to a place where can have absolute confidence in their Life Safety Code compliance.”

Related Stories

| Aug 11, 2010

Skidaway Institute of Oceanography opens new research facility

Scientists at the Skidaway Institute of Oceanography in Skidaway Island, Ga., moved into a new facility that enables them to expand the scope of the Institute’s leading-edge research on marine and coastal systems. The $5 million Marine and Coastal Science Research and Instructional Center (MCSRIC) provides high quality laboratory space in a bright, open, airy and environmentally sensitive setting.

| Aug 11, 2010

Construction Specifications Institute to end support of MasterFormat 95 on December 31, 2009

The Construction Specifications Institute (CSI) announced that the organization will cease to license and support MasterFormat 95 as of December 31, 2009. The CSI Board of Directors voted to stop licensing and supporting MasterFormat 95 during its June 16, 2009, meeting at the CSI Annual Convention in Indianapolis.

| Aug 11, 2010

Bowdoin College Museum of Art
Brunswick, Maine

Since its founding in 1794, when what is now the state of Maine was still part of the Commonwealth of Massachusetts, Bowdoin College has played a pivotal role in the educational and cultural life of Maine. Contributing to that role for more than a century has been the Walker Art Building, an 1894 McKim, Mead & White-designed structure and home to the college’s Museum of Art.

| Aug 11, 2010

Gensler among eight teams named finalists in 'classroom of the future' design competition

Eight teams were recognized today as finalists of the 2009 Open Architecture Challenge: Classroom. Finalists submitted designs ranging from an outdoor classroom for children in inner-city Chicago, learning spaces for the children of salt pan workers in India, safe spaces for youth in Bogota, Colombia and a bamboo classroom in the Himalayan mountains.

| Aug 11, 2010

9 rooftop photovoltaic installation tips

The popularity of rooftop photovoltaic (PV) panels has exploded during the past decade as Building Teams look to maximize building energy efficiency, implement renewable energy measures, and achieve green building certification for their projects. However, installing rooftop PV systems—rack-mounted, roof-bearing, or fully integrated systems—requires careful consideration to avoid damaging the roof system.

| Aug 11, 2010

The Joule Hotel
Dallas, Texas

The Joule Hotel in Dallas, designed by local firm Coburn & Smith, was constructed in 1927 as the Dallas National Bank Building. Originally one of the finest examples of gothic revival architecture in Texas, it had had most of its gothic elements removed over the years after being converted into an office building and later abandoned. What was left had fallen into disrepair.

boombox1
boombox2
native1

More In Category




Giants 400

Top 75 Engineering Firms for 2023

Kimley-Horn, WSP, Tetra Tech, Langan, and IMEG head the rankings of the nation's largest engineering firms for nonresidential buildings and multifamily buildings work, as reported in Building Design+Construction's 2023 Giants 400 Report.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021