CannonDesign is acquiring and merging with Astorino, a Pittsburgh-based multidisciplinary firm in a deal that strengthens processes, assets, and opportunities for both firms. The merger increases collective capabilities, opens new markets, and enhances value for clients.
The firms cited their close alignment on values, vision, and culture as the foundation of the new relationship—both CannonDesign and Astorino place a premium on design solutions that address unique challenges faced by clients.
“Together, our talented professionals will pursue outcome-based design solutions that optimize our clients’ performance,” commented Gary Miller, Co-Chairman and CEO of CannonDesign. “This merger brings added value and opportunity to both organizations.”
The merger also extends CannonDesign’s presence in the markets Astorino currently serves and positions the firm to expand capabilities into industry innovations for project delivery offering increased choices for clients.
A Design-Led Design-Build division to be managed from the Pittsburgh office will advance innovative methods for project delivery. Louis P. Astorino, Jr., who spearheaded Astorino’s Design Led-Design Build practice group during the last decade, will lead this strategic growth initiative nationwide.
“CannonDesign is a recognized global leader, and we’ve partnered on projects in the past,” said Louis Astorino, Jr., CEO of Astorino. “We are compatible in culture, and complementary in talent, experience and capabilities. This is a superb opportunity for our team to work with CannonDesign’s professionals to expand and innovate.”
While strengthening the firm’s existing focus on healthcare, education, and corporate commercial markets, CannonDesign will gain access to Astorino’s breadth and depth of talent and experience in both standard architectural services as well as innovative processes in research, design, and construction. The firm also will gain access to a valued network of relationships in Pittsburgh and Abu Dhabi, vibrant regions with high growth potential.
Related Stories
| Mar 27, 2012
Hollister Construction completes LEED Silver bank in Woodland Park, N.J.
Ground-up construction project included installation of solar panels.
| Mar 26, 2012
Jones Lang LaSalle completes construction of $536M Parkview Regional Medical Center
Hospital ushers in new era of local access to advanced medical treatments in Northeast Indiana.
| Mar 26, 2012
McCarthy tops off Math and Science Building at San Diego Mesa College
Designed by Architects | Delawie Wilkes Rodrigues Barker, the new San Diego Mesa College Math and Science Building will provide new educational space for students pursuing degree and certificate programs in biology, chemistry, physical sciences and mathematics.
| Mar 26, 2012
Los Angeles County to host free green building training
Opportunity for residential and commercial building professionals to gain insight on state and county green building standards and regulations.
| Mar 26, 2012
Ball State University completes nation's largest ground-source geothermal system
Ball State's geothermal system will replace four aging coal-fired boilers to provide renewable power that will heat and cool 47 university buildings, representing 5.5-million-sf on the 660-acre campus.
| Mar 22, 2012
Hawaiian architecture firm chooses FRP trellis system over traditional materials
MGA Architecture plans to add five more trellis systems on the neighboring building.
| Mar 22, 2012
Moline Public Library uses copper as an exterior building material
Architects incorporate decorative copper panels to create the look of a heavy plate copper shingle.
| Mar 21, 2012
10 common data center surprises
Technologies and best practices provide path for better preparation.
| Mar 21, 2012
ABI remains positive for fourth straight month
Highest spike in inquiries for new projects since 2007.
| Mar 21, 2012
Iowa’s Mercy Medical Center’s new Emergency Department constructed using Lean design
New Emergency Department features a "racetrack" design with a central nurses' station encircled by 19 private patient examination rooms and 2 trauma treatment rooms.