CannonDesign is acquiring and merging with Astorino, a Pittsburgh-based multidisciplinary firm in a deal that strengthens processes, assets, and opportunities for both firms. The merger increases collective capabilities, opens new markets, and enhances value for clients.
The firms cited their close alignment on values, vision, and culture as the foundation of the new relationship—both CannonDesign and Astorino place a premium on design solutions that address unique challenges faced by clients.
“Together, our talented professionals will pursue outcome-based design solutions that optimize our clients’ performance,” commented Gary Miller, Co-Chairman and CEO of CannonDesign. “This merger brings added value and opportunity to both organizations.”
The merger also extends CannonDesign’s presence in the markets Astorino currently serves and positions the firm to expand capabilities into industry innovations for project delivery offering increased choices for clients.
A Design-Led Design-Build division to be managed from the Pittsburgh office will advance innovative methods for project delivery. Louis P. Astorino, Jr., who spearheaded Astorino’s Design Led-Design Build practice group during the last decade, will lead this strategic growth initiative nationwide.
“CannonDesign is a recognized global leader, and we’ve partnered on projects in the past,” said Louis Astorino, Jr., CEO of Astorino. “We are compatible in culture, and complementary in talent, experience and capabilities. This is a superb opportunity for our team to work with CannonDesign’s professionals to expand and innovate.”
While strengthening the firm’s existing focus on healthcare, education, and corporate commercial markets, CannonDesign will gain access to Astorino’s breadth and depth of talent and experience in both standard architectural services as well as innovative processes in research, design, and construction. The firm also will gain access to a valued network of relationships in Pittsburgh and Abu Dhabi, vibrant regions with high growth potential.
Related Stories
| Apr 25, 2012
Missner Group names McCrory VP of property management
McCrory will be responsible for overseeing the financial and operational needs of the firm’s commercial real estate portfolio which includes more than two million square feet of property.
| Apr 25, 2012
Rogers joins Morgan/Harbour as senior project manager
Rogers will also manage the construction process and daily activities as well as act as the interface between the subcontractors, owners, municipalities and regulatory agencies
| Apr 25, 2012
J.C. Anderson selected for 50,000-sf build out at Chicago’s DePaul University
The build-out will consist of the construction of new offices, meeting rooms, video rooms and a state-of-the-art multi-tiered Trading Room.
| Apr 24, 2012
ULI Real Estate Consensus Forecast, projects improvements for the real estate industry through 2014
Survey is based on opinions from 38 of the nation’s leading real estate economists and analysts and suggests a marked increase in commercial real estate activity, with total transaction volume expected to rise from $250 billion in 2012 to $312 billion in 2014.
| Apr 24, 2012
Roofing Supply Group acquired by Clayton, Dubilier & Rice
RSG provides a complete offering of residential and commercial roofing materials and related supplies.
| Apr 24, 2012
McLennan named Ashoka Fellow
McLennan was recognized for his work on the Living Building Challenge.
| Apr 24, 2012
AECOM design and engineering team realizes NASA vision for Sustainability Base
LEED Platinum facility opens at NASA Ames Research Center at California’s Moffett Field.
| Apr 23, 2012
Vegas’ CityCenter called financial ‘black hole’
Two and a half years ago, stockholders filed six lawsuits after the stock price fell from $99.75 on Oct. 9, 2007, to $1.89 on March 5, 2009. Bondholders sued over similar steep losses.
| Apr 23, 2012
Innovative engineering behind BIG’s Vancouver Tower
Buro Happold’s structural design supports the top-heavy, complex building in a high seismic zone; engineers are using BIM technology to design a concrete structure with post-tensioned walls.