CannonDesign is acquiring and merging with Astorino, a Pittsburgh-based multidisciplinary firm in a deal that strengthens processes, assets, and opportunities for both firms. The merger increases collective capabilities, opens new markets, and enhances value for clients.
The firms cited their close alignment on values, vision, and culture as the foundation of the new relationship—both CannonDesign and Astorino place a premium on design solutions that address unique challenges faced by clients.
“Together, our talented professionals will pursue outcome-based design solutions that optimize our clients’ performance,” commented Gary Miller, Co-Chairman and CEO of CannonDesign. “This merger brings added value and opportunity to both organizations.”
The merger also extends CannonDesign’s presence in the markets Astorino currently serves and positions the firm to expand capabilities into industry innovations for project delivery offering increased choices for clients.
A Design-Led Design-Build division to be managed from the Pittsburgh office will advance innovative methods for project delivery. Louis P. Astorino, Jr., who spearheaded Astorino’s Design Led-Design Build practice group during the last decade, will lead this strategic growth initiative nationwide.
“CannonDesign is a recognized global leader, and we’ve partnered on projects in the past,” said Louis Astorino, Jr., CEO of Astorino. “We are compatible in culture, and complementary in talent, experience and capabilities. This is a superb opportunity for our team to work with CannonDesign’s professionals to expand and innovate.”
While strengthening the firm’s existing focus on healthcare, education, and corporate commercial markets, CannonDesign will gain access to Astorino’s breadth and depth of talent and experience in both standard architectural services as well as innovative processes in research, design, and construction. The firm also will gain access to a valued network of relationships in Pittsburgh and Abu Dhabi, vibrant regions with high growth potential.
Related Stories
| May 29, 2012
Torrance Memorial Medical Center’s pediatric burn patients create their version of new Patient Tower using Legos
McCarthy workers joined the patients, donning construction gear and hard hats, to help with their building efforts.
| May 29, 2012
Reconstruction Awards Entry Information
Download a PDF of the Entry Information at the bottom of this page.
| May 29, 2012
AIA expands Documents-On-Demand service??
Six new documents added, DOD offers nearly 100 contract documents.
| May 29, 2012
Legrand achieves over 20% energy-intensity reduction in Presidential Challenge
West Hartford headquarters announced as Better Buildings, Better Plants “Showcase” site.
| May 29, 2012
Thornton Tomasetti/Fore Solutions provides consulting for Phase I of Acadia Gateway Center
Project receives LEED Gold certification.
| May 24, 2012
2012 Reconstruction Awards Entry Form
Download a PDF of the Entry Form at the bottom of this page.
| May 24, 2012
Gilbane’s Spring 2012 economic report identifies multiple positive economic and market factors
Anticipating increasing escalation in owner costs through 2014.
| May 24, 2012
Construction backlog declines 5.4% in the first quarter of 2012?
The nation’s nonresidential construction activity will remain soft during the summer months, with flat to declining nonresidential construction spending.
| May 24, 2012
Stellar completes St. Mark’s Episcopal Church and Day School renovation and expansion
The project united the school campus and church campus including a 1,200-sf chapel expansion, a new 10,000-sf commons building, 7,400-sf of new covered walkways, and a drop-off pavilion.