flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Canada GBC launching Zero Carbon Buildings Initiative

Codes and Standards

Canada GBC launching Zero Carbon Buildings Initiative

First step toward Zero Carbon Building Standard.


By Peter Fabris, Contributing Editor | November 18, 2016

Pixabay Public Domain

The Canada Green Building Council (CaGBC) recently launched the first phase of its Zero Carbon Buildings Initiative.

The new framework is a precursor to the launch of a Zero Carbon Building Standard in spring 2017. Canada is striving to develop more lower-carbon commercial, institutional, and high-rise residential buildings in an effort to reduce greenhouse gases by 30% by 2030.

The Zero Carbon Buildings Framework establishes five key components for evaluating building carbon footprints:

• Greenhouse gas intensity metric for assessing a building’s emissions taking into account  regional emissions factors

• Energy intensity metrics to incentivize design of highly efficient, reliable, and resilient buildings

• Peak energy demand metric to encourage the use of peak-shaving measures

• Embodied carbon metric to recognize importance of building material lifecycle impacts

• Requirement that renewable energy be generated on-site or procured directly 

Upcoming phases of the Zero Carbon Initiative will include the identification of specific pathways to zero carbon, a zero carbon building pilot program, and the development of a verification program.

Related Stories

Codes and Standards | Oct 11, 2018

On-site staff key to energy benchmarking project for property management company

Manager training, data sharing are critical to meeting 20% utility cost reduction goal.

Codes and Standards | Oct 10, 2018

Interactive heat maps track temperature ranges in U.S. cities

Urban heat island effect can vary by as much as 37°F in the same city.

Codes and Standards | Oct 9, 2018

Power systems will become more decentralized for better disaster resiliency

Businesses, homeowners will control more power-generation capacity.

Codes and Standards | Oct 5, 2018

Getting commitments from key subs critical on government contracts

Withdrawn subcontractor bids can be costly.

Codes and Standards | Oct 4, 2018

Internal watchdog says EPA falling short to protect school children from asbestos

Agency not conducting enough inspections, report says.

Codes and Standards | Oct 3, 2018

Climate change impacts could prompt realignment of assets for commercial property developers

Strategies include reducing exposure to properties in flood-prone areas.

Codes and Standards | Oct 2, 2018

Political will, tougher standards needed to reach carbon neutral goal

Stretch codes, more stringent credentials for designers, contractors, and inspectors may be needed.

Codes and Standards | Sep 27, 2018

Natural light is the most prized office perk

Employees crave sunshine and views of the outdoors more than cafeterias, fitness centers, and childcare.

Codes and Standards | Sep 26, 2018

Industry consensus needed for multifamily energy efficiency retrofit approach

Choice of insulating materials can impact indoor air quality, resident health.

Codes and Standards | Sep 25, 2018

New market forces disrupting global real estate development industry

Executives concerned about trade policy, labor shortages, approval processes.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021