flexiblefullpage
interstitial1
Currently Reading

Campus-wide energy-efficiency program aims to deliver $3.5 million in energy and operational savings

Campus-wide energy-efficiency program aims to deliver $3.5 million in energy and operational savings

Merced College and Honeywell will use the school’s energy usage statistics to develop a course curriculum on sustainability, and raise awareness among students of the positive impact conservation practices contribute to the community.


By By BD+C Staff | November 17, 2011
Honeywell Merced College
Honeywell will complete the building system enhancements and future maintenance under a 15-year, $3.1 million performance contra

Honeywell and Merced College kicked off an energy conservation initiative that aims to reduce the school’s annual operating costs by $180,000 through energy-efficient building upgrades.

The program also includes the launch of an enhanced college curriculum focused on teaching conservation strategies that utilize the energy-efficient building upgrades as a real-world case study for classroom learning.

As part of the project, Honeywell will make building infrastructure improvements to 16 campus buildings, including the installation of energy-efficient lighting and upgraded heating, ventilation and air conditioning (HVAC) systems. Overall, these campus building improvements are expected to trim the college’s electricity use by more than 1.5 million kilowatt-hours annually - enough energy to power nearly 180,000 homes.

Merced College and Honeywell will use the school’s energy usage statistics to develop a course curriculum on sustainability, and raise awareness among students of the positive impact conservation practices contribute to the community. As part of this program, using Honeywell’s Energy Management System (EMS), Sustainability Interns will track resource usage in 16 campus buildings. The interns will develop a newsletter to update students, faculty and staff on the program’s progress and help lead additional campus-wide conservation efforts, such as recycling competitions and car-sharing programs.

Honeywell will complete the building system enhancements and future maintenance under a 15-year, $3.1 million performance contract. This will allow school officials to pay for the upgrades using the cost savings generated, which Honeywell guarantees. As a result, the program won’t increase school budgets or require additional funding.

Honeywell will implement a variety of conservation measures across campus buildings, including:

·         Sub-meters in 16 campus buildings to provide facility personnel with a more granular view of energy usage throughout campus from a centralized energy management system

·         Updated HVAC systems for the gymnasium, student union, theater and computer services building to improve energy efficiency

·         High-efficiency lighting for building exteriors and interiors, including light-emitting diode (LED) lights. BD+C

Related Stories

Sponsored | Modular Building | Feb 17, 2015

When lava flow in Hawaii threatens a public school district, officials turn to modular

Hawaii Modular Space, a Williams Scotsman company, designed temporary classroom space for the Pahoa and Keeau schools that would become displaced due to ongoing lava flow in Pahoa, Hawaii.

Healthcare Facilities | Feb 17, 2015

10 healthcare trends worth sharing

The rise of the medical home model of care and ongoing Lean value stream improvement are among the top healthcare industry trends.

High-rise Construction | Feb 17, 2015

Work begins on Bjarke Ingels' pixelated tower in Calgary

Construction on Calgary’s newest skyscraper, the 66-story Telus Sky Tower, recently broke ground. 

Mixed-Use | Feb 13, 2015

First Look: Sacramento Planning Commission approves mixed-use tower by the new Kings arena

The project, named Downtown Plaza Tower, will have 16 stories and will include a public lobby, retail and office space, 250 hotel rooms, and residences at the top of the tower. 

Architects | Feb 13, 2015

OMA commissioned to design newest New York High Line addition

Rem Koolhaas is the latest addition to the list of starchitects working on projects near the High Line elevated park.

Codes and Standards | Feb 12, 2015

ASHRAE, USGBC, IES consider biomass requirements in green building standard

The proposal would add biomass to approved renewables.

Codes and Standards | Feb 12, 2015

New Appraisal Institute form aids in analysis of green commercial building features

The Institute’s Commercial Green and Energy Efficient Addendum offers a communication tool that lenders can use as part of the scope of work. 

Office Buildings | Feb 12, 2015

Is Houston headed for an office glut?

More than 13 million sf could be completed this year, adding to this metro’s double-digit vacancy woes.

Modular Building | Feb 12, 2015

New shipping container complex begins construction in Albuquerque

The Green Jeans Farmery already has a hydroponic farm component courtesy of owner and entrepreneur Roy Solomon.

Transit Facilities | Feb 12, 2015

Gensler proposes network of cycle highways in London’s unused underground

Unused tube lines would host pedestrian paths, cycle routes, cultural spaces, and retail outlets.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021