The annual Giants 300 Report ranks the top AEC firms in commercial construction, by revenue. You’ll want to be sure your firm is on the Giants 300 list, as potential clients look to these rankings for prospective firms to design and construct their future projects. Giants 300 results will be published in our July 2015 issue.
CLICK HERE TO DOWNLOAD THE 2015 GIANTS 300 SURVEY
NOTE: The Excel document has multiple tabs. If you do not see the tabs at the bottom of the worksheet, go to the “view” tab on the menu and select “full screen." You should see six tabs at the bottom.
Completed surveys must be returned by Friday, April 24, 2015. Please fill out the survey form and attach it in an email to BOTH dbarista@sgcmail.com and bdcGiants2015@sgcmail.com.
There are two additional ways to participate in the July Giants 300 report:
1. SUBMIT YOUR LATEST PROJECT PHOTOS FOR CONSIDERATION
As in years past, we're looking for great project photos for use in the July Giants issue, including on the cover. Please email your photo submissions to me (dbarista@sgcmail.com) by April 24. If possible, please include a short description of each image, with the project name and location and key Building Team members (owner/client, architect, structural engineer, MEP engineer, and contractor), and photo credit.
2. SUBMIT YOUR IDEAS FOR THE JULY GIANTS ISSUE EDITORIAL COVERAGE
The editors would like to hear from your AEC teams on the latest trends, projects, and innovations across a number of major building sectors that will be covered in the July Giants issue. They include: government, green building, healthcare, higher education, hotels/hospitality, K-12 schools, military, multifamily, office buildings, reconstruction, retail, science & technology, sports & recreation, and transit/TOD. Please email a short summary (and photos, if applicable) of your trends/innovations/projects for any of these sectors to dbarista@sgcmail.com by April 24.
Questions? Contact David Barista, Editorial Director, at dbarista@sgcmail.com or 847-954-7929.
Related Stories
Sponsored | Building Team | Jun 20, 2017
Plan ahead when building in the west
Getting a project through plan review can be an unusually long process, anywhere from six months to two years.
Architects | May 9, 2017
Movers + Shapers: The social connector
Studio Gang gains fans with buildings that unite people and embrace the outside world.
Sponsored | Building Team | May 8, 2017
The builder is the building: Finding the right builder
The most important factor in making sure the where, when, what, and how go smoothly is making sure you pick the right who.
Architects | May 3, 2017
Avoiding trouble in paradise: Tips on building successfully in the Caribbean
The island setting itself is at the root of several of these disruptive assumptions.
Libraries | Apr 7, 2017
Eight recipients selected for the 2017 AIA/ALA Library Building Awards
Columbus Metropolitan Library, National Library of Latvia, and Varina Area Library were all honored by the AIA and ALA.
K-12 Schools | Apr 7, 2017
Is an alternative project delivery method right for your K-12 school district?
With California’s increasingly busy—and costly—construction market, it’s becoming more difficult to predict costs with a typical design-bid-build delivery method.
Market Data | Apr 6, 2017
Architecture marketing: 5 tools to measure success
We’ve identified five architecture marketing tools that will help your firm evaluate if it’s on the track to more leads, higher growth, and broader brand visibility.
Sports and Recreational Facilities | Apr 5, 2017
Informed design: A dynamic approach to athletic facilities design
With the completion of the athletic facility upgrade—dubbed the Arden Project—students will have access to state-of-the-art facilities.
Building Team | Apr 4, 2017
Dispelling five myths about post-occupancy evaluations
Many assume that post-occupancy (POE) is a clearly-defined term and concept, but the meaning of POE in practice remains wildly inconsistent.
Office Buildings | Apr 4, 2017
Amazon’s newest office building will be an ‘urban treehouse’
The building will provide 405,000 sf of office space in downtown Seattle.