Calatrava ordered to pay millions for 'shortcomings in his work' on conference center project

Calatrava ordered to pay millions for 'shortcomings in his work' on conference center project

Famed architect Santiago Calatrava must pay 2.9 million euros due to faulty design work on the Palacio de Congresos project in Oviedo, Spain. 


By BD+C Staff | February 21, 2014
The building's owner says the structure's mechanical visor has never worked beca
The building's owner says the structure's mechanical visor has never worked because of problems with its hydraulics.

A Spanish court ruled that famed architect Santiago Calatrava must pay 2.9 million euros (roughly $4 million) to a property development company, citing "shortcomings in his work" related to the Palacio de Congresos project in Oviedo, Spain, according to the Associated Press.

According to a report from The Guardian, Palacio de Congresos' infamous, huge mechanical visor has never worked because of problems with its hydraulics. Calatrava has been in an ongoing battle with the building's owners through the courts after they blamed him and refused to pay his full fees.

The architect is facing legal action in his home town, as well. As BD+C reported in December 2013, officials with the city of Valencia, Spain, are blaming Calatrava for the rapid deterioration of buildings within its City of Arts and Sciences complex. 

And the owner of another Calatrava-designed project, Ysios winery in the rainy Alava region of northern Spain, say the building's dramatic, undulating roof is leaking

Related Stories

| Oct 5, 2011

GREENBUILD 2011: Sustainable construction should stress durability as well as energy efficiency

There is now a call for making enhanced resilience of a building’s structure to natural and man-made disasters the first consideration of a green building. 

| Oct 5, 2011

GREENBUILD 2011: Solar PV canopy system expanded for architectural market

Turnkey systems create an aesthetic architectural power plant. 

| Oct 5, 2011

GREENBUILD 2011: Kohler builds sustainable booth at Greenbuild 2011

In a setting composed of reclaimed materials, biodegradable signage, energy-efficient lighting and more, exhibitor highlights its new products with ecological awareness. 

| Oct 5, 2011

GREENBUILD 2011: Brick offers growing options for sustainable building design

Brick exteriors, interiors and landscaping options can increase sustainability that also helps earn LEED certification.

| Oct 5, 2011

GREENBUILD 2011: Roof hatch designed for energy efficiency

The cover features a specially designed EPDM finger-type gasket that ensures a positive seal with the curb to reduce air permeability and ensure energy performance. 

| Oct 4, 2011

GREENBUILD 2011

Click here for the latest news and products from Greenbuild 2011, Oct. 4-7, in Toronto.

| Oct 4, 2011

GREENBUILD 2011: Methods, impacts, and opportunities in the concrete building life cycle

Researchers at the Massachusetts Institute of Technology’s (MIT) Concrete Sustainability Hub conducted a life-cycle assessment (LCA) study to evaluate and improve the environmental impact and study how the “dual use” aspect of concrete.

| Oct 4, 2011

GREENBUILD 2011: Johnsonite features sustainable products

Products include rubber flooring tiles, treads, wall bases, and more. 

| Oct 4, 2011

GREENBUILD 2011: Nearly seamless highly insulated glass curtain-wall system introduced

Low insulation value reflects value of entire curtain-wall system. 

boombox1
boombox2
native1

More In Category


Urban Planning

The magic of L.A.’s Melrose Mile

Great streets are generally not initially curated or willed into being. Rather, they emerge organically from unintentional synergies of commercial, business, cultural and economic drivers. L.A.’s Melrose Avenue is a prime example. 


Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021