Calatrava ordered to pay millions for 'shortcomings in his work' on conference center project

Calatrava ordered to pay millions for 'shortcomings in his work' on conference center project

Famed architect Santiago Calatrava must pay 2.9 million euros due to faulty design work on the Palacio de Congresos project in Oviedo, Spain. 


By BD+C Staff | February 21, 2014
The building's owner says the structure's mechanical visor has never worked beca
The building's owner says the structure's mechanical visor has never worked because of problems with its hydraulics.

A Spanish court ruled that famed architect Santiago Calatrava must pay 2.9 million euros (roughly $4 million) to a property development company, citing "shortcomings in his work" related to the Palacio de Congresos project in Oviedo, Spain, according to the Associated Press.

According to a report from The Guardian, Palacio de Congresos' infamous, huge mechanical visor has never worked because of problems with its hydraulics. Calatrava has been in an ongoing battle with the building's owners through the courts after they blamed him and refused to pay his full fees.

The architect is facing legal action in his home town, as well. As BD+C reported in December 2013, officials with the city of Valencia, Spain, are blaming Calatrava for the rapid deterioration of buildings within its City of Arts and Sciences complex. 

And the owner of another Calatrava-designed project, Ysios winery in the rainy Alava region of northern Spain, say the building's dramatic, undulating roof is leaking

Related Stories

Sponsored | | Nov 19, 2014

3 technology trends on the horizon

As technology continues to evolve exponentially, construction firms have ongoing opportunities to enhance the quality, speed, and efficiency of building projects and processes. SPONSORED CONTENT

Sponsored | | Nov 19, 2014

Long-life coatings vs. long-life screws

Are you concerned with the long-life protection of your metal building project? SPONSORED CONTENT

Sponsored | | Nov 19, 2014

Fire resistive, blast-resistant glazing: Where security, safety, and transparency converge

Security, safety and transparency don’t have to be mutually exclusive thanks to new glazing technology designed to support blast and fire-resistant secure buildings. SPONSORED CONTENT

| Nov 19, 2014

Must see: Arup, Damian Rogers propose urban surf park in Melbourne

The surfing pool would offer 98-foot-wide waves that would run the length of the 500-foot-long enclave.

| Nov 18, 2014

Architecture Billings Index dips in October, still shows positive outlook design services

Headed by the continued strength in the multifamily residential market and the emerging growth for institutional projects, demand for design services continues to be healthy, as exhibited in the latest Architecture Billings Index.

| Nov 18, 2014

New tool helps developers, contractors identify geographic risk for construction

The new interactive tool from Aon Risk Solutions provides real-time updates pertaining to the risk climate of municipalities across the U.S.

| Nov 18, 2014

5 big trends changing the world of academic medicine

Things are changing in healthcare. Within academic medicine alone, there is a global shortage of healthcare professionals, a changing policy landscape within the U..S., and new view and techniques in both pedagogy and practice, writes Perkins+Will’s Pat Bosch.

| Nov 18, 2014

Grimshaw releases newest designs for world’s largest airport

The airport is expected to serve 90 million passengers a year on the opening of the first phase, and more than 150 million annually after project completion in 2018. 

| Nov 17, 2014

Nearly two years after Sandy Hook, the bloodshed continues

It’s been almost two years since 20 first-graders were shot and killed at Sandy Hook Elementary School in Newtown, Conn., but these incidents, both planned and random, keep occurring, writes BD+C's Robert Cassidy.

boombox1
boombox2
native1

More In Category

3D Printing

3D-printed construction milestones take shape in Tennessee and Texas

Two notable 3D-printed projects mark milestones in the new construction technique of “printing” structures with specialized concrete. In Athens, Tennessee, Walmart hired Alquist 3D to build a 20-foot-high store expansion, one of the largest freestanding 3D-printed commercial concrete structures in the U.S. In Marfa, Texas, the world’s first 3D-printed hotel is under construction at an existing hotel and campground site.


University Buildings

Des Moines University Medicine and Health Sciences opens a new 88-acre campus

Des Moines University Medicine and Health Sciences has opened a new campus spanning 88 acres, over three times larger than its previous location. Designed by RDG Planning & Design and built by Turner Construction, the $260 million campus features technology-rich, flexible educational spaces that promote innovative teaching methods, expand research activity, and enhance clinical services. The campus includes four buildings connected with elevated pathways and totaling 382,000 sf. 



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021