flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Cadence McShane's Broadway Chapter Apartments earns 2022 TEXO Distinguished Building Award

Multifamily Housing

Cadence McShane's Broadway Chapter Apartments earns 2022 TEXO Distinguished Building Award

Built by Cadence McShane, Broadway Chapter Apartments is a 242-unit rental complex in Fort Worth, Texas.


By Malcolm Crumbley, Associate Editor | March 23, 2022
Broadway Chapter Apartments ext
Cadence McShane was the contractor for the 320,000-sf Broadway Chapter Apartments in Fort Worth, Texas.

Cadence McShane Construction Company received first place in the 2022 TEXO Distinguished Building Award in the General Contractor – Residential Multifamily 1 ($0 - $150M) category for the Broadway Chapter Apartments project. The project was selected based on these criteria:

  • Difficulty in construction resulting from design, location, and materials
  • Unusual construction techniques involved
  • Final appearance and quality of the finished product
  • Timeliness of completion
Broadway Chapter ext 2
Broadway Chapter Apartments was designed by Lamar Johnson Collaborative. 

Cadence McShane Construction Company's Broadway Chapter Apartments project is located in Fort Worth Texas and was designed by Lamar Johnson Collaborative, built on behalf of CRG Real Estate Solutions. The community features 4,500 square feet of common space and consists of a state-of-the-art fitness studio, coffee bar, library, lounge, and Zoom rooms. Outside amenities include an infinity edge pool, a recreational area, dog run, outdoor grilling areas, fire pit, and sun deck.

Broadway Chapter Apartments Interior
The lounge is one of the many amenities of the Broadway Chapter Apartments.

The 320,000-sf complex offers units in studio, one-bedroom, and two-bedroom. Each apartment has oversized windows that allow views of downtown Fort Worth.

 

Related Stories

Multifamily Housing | Aug 16, 2020

TCA Architects specifies Engineered Floors products for 304-unit apartment complex in Tracy, Calif.

TCA Architects specified Lewis Rigid Stone Polymer floating plank and Lewis Gold 100% Solution-Dyed high-performance fiber carpet for Harvest in Tracy, Calif.

Multifamily Housing | Aug 3, 2020

71-unit 100% affordable housing development breaks ground in Mountain View, Calif.

Van Meter Williams Pollack is designing the project.

Multifamily Housing | Aug 2, 2020

Stantec-designed 17 West mixed-use development completed in Miami Beach

Stantec-designed 17 West mixed-use development completed, with first Trader Joe's in Miami Beach.

Multifamily Housing | Jul 31, 2020

Railings manufacturer VistaPro launches its new website

VistaPro Architectural Railing Solutions launches new website.

Multifamily Housing | Jul 29, 2020

Multifamily construction proposal activity sees modest rebound in Q2 2020

Among the firms that work in the multifamily sector, 31% said that proposal activity increased in the second quarter, while 24% said it decreased.

Multifamily Housing | Jul 29, 2020

San Francisco’s Millennium Tower fix approved, moving forward

Simpson Gumpertz & Heger will be the engineer-of-record for the fix.

Multifamily Housing | Jul 27, 2020

Putting 'home' at the heart of affordable housing

Home is a powerful thing. It’s the place that forms you, a guiding set of relationships, memories, and experiences that, for better or worse, make you who you are.

Multifamily Housing | Jul 20, 2020

Abandoned 15-story high-rise becomes mixed-use luxury apartment building

Kimmich Smith Architecture designed the project.

Coronavirus | Jul 20, 2020

Student housing amid the pandemic, infection control in buildings, and future airport design on "The Weekly"

Experts from Core Spaces, Bala Consulting Engineers, and Populous were interviewed in the July 23 streaming program from Horizon TV.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021