flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Business school goes for maximum vision, transparency, and safety with fire rated glass

Business school goes for maximum vision, transparency, and safety with fire rated glass

Architects were able to create a 2-hour exit enclosure/stairwell that provided vision and maximum fire safety using fire rated glazing that seamlessly matched the look of other non-rated glazing systems.


By By BD+C Staff | July 16, 2012
The architects were able to create a 2-hour exit enclosure/stairwell that provid
The architects were able to create a 2-hour exit enclosure/stairwell that provided vision and maximum fire safety using fire rat

The David Eccles School of Business on the University of Utah campus is a new state-of-the-art teaching, learning, and research facility designed to meet future growth in student enrollment. SAFTI FIRST heard about this project following a successful AIA lunchtime presentation at MHTN Architects by Kevin Turner, SAFTI FIRST’s local architectural representative.

The design called for a 28- x 18-ft two-hour interior glass wall with a 90 minute full-vision door in an exit enclosure/stairwell. The architects selected fire rated glass to meet fire rating requirements while providing maximum visibility in the space. The project’s specifications also required the fire rated glass to have the same optical clarity as the adjacent non-rated glass systems.

To meet both the design and code requirements, SAFTI FIRST provided SuperLite II-XL 120 in GPX Framing for the walls and SuperLite II-XL 90 in GPX Door Framing for the full-vision door. With their clean lines, sharp edges and multiple finish options, the GPX Frames matched the non-rated storefront systems. Matching the optical clarity of the adjacent non-rated glazing was easily achieved through SuperLite II-XL’s superior optical clarity, free of wires or any tints.

In addition, designers were able to take advantage of SuperLite II-XL 120’s large clear view areas, which is currently the largest available in the market for 2-hour fire resistive applications.

Project Summary


Project: David Eccles School of Business, The University of Utah, Salt Lake City
Architect: MHTN Architects
Contract Glazier: Mollerup Glass
Products used: SuperLite II-XL 90/120 in GPX Framing

As far as the code requirements are concerned, 2-hour exit enclosures allow 90 min. doors with full vision lights using glazing tested to ASTME 119 for 90 minutes. Any other glazing in the enclosure wall, including sidelites and transoms around the door, must have a 2-hour rating that meets the ASTM E-119 wall requirements (see Tables 716.5 and 716.6 in the 2012 IBC).

SuperLite II-XL in GPX Framing meets the ASTM E-119 requirement for up to 2 hours and is impact safety rated to CPSC Cat. II, the maximum safety standard.  This ability to block radiant heat transfer also made it possible to have a full-vision 90 minute door. If fire protective glazing such as wired glass and ceramics were used in the vision panel, it would be limited to 100 square inches.

At the end of the project, the architects were able to create a 2-hour exit enclosure/stairwell that provided vision and maximum fire safety using fire rated glazing that seamlessly matched the look of other non-rated glazing systems. As an additional benefit, natural daylight was also able to penetrate further into the building because of the transparency provided by the fire rated glass wall. 

To locate the SAFTI FIRST representative in your area, click here. +

Related Stories

Architects | Sep 22, 2017

Design giants merge: FKP joins CannonDesign

The deal strengthens CannonDesign’s pediatric healthcare expertise, establishes presence in Texas and Ohio.

40 Under 40 | Sep 22, 2017

Meet the 40 Under 40 Class of 2017

These AEC stars are making their mark in business, philanthropy, and in their communities.

40 Under 40 | Sep 21, 2017

Meet the 40 Under 40 Class of 2017

These AEC stars are making their mark in business, philanthropy, and in their communities.

Office Buildings | Sep 20, 2017

Five Stantec offices move into one Fifth Avenue location

The new location provides the firm with 40,000 sf of space.

Architects | Sep 19, 2017

What we talk about when we talk about placemaking

What does Good Growth mean and how do we set about achieving it?

Architects | Sep 13, 2017

Leo A Daly hires hospitality-design veteran to lead its Dallas office

Ken Martin views this sector as an incubator of innovation.

Museums | Sep 8, 2017

CAF announces plans for 20,000-sf Chicago Architecture Center to be built on East Wacker Drive

The Adrian Smith + Gordon Gill-designed space will open in summer 2018.

Architects | Sep 6, 2017

Top 110 university architecture firms

Perkins+Will, Gensler, and CannonDesign top BD+C’s ranking of the nation’s largest university sector architecture and AE firms, as reported in the 2017 Giants 300 Report.

Contractors | Sep 6, 2017

Following the money: G702 progress payment certifications

There is no single method of calculating progress payments, but the most common formula is the percentage of completion applied to the total contract price, less a retainage which is held by the owner until final acceptance of the project.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021