The Advisory Committee of the BUILDINGChicago/Greening the Heartland 2014 Conference is now accepting proposals for presenters and topics.
Now in its second year, the event is sponsored by Building Design+Construction magazine, AIA Chicago, the Builders Association, USGBC-Illinois, and the Greening the Heartland Committee. It will take place September 29-October 1, 2014, at North America’s largest LEED Gold-certified hotel, the Holiday Inn Chicago Mart Plaza.
The BUILDINGChicago track will provide a wide variety of educational and networking opportunities built upon BD+C’s strong track record of high-quality, AIA-accredited education through its BD+C University. The online university offers a convenient educational platform, available 24/7 from anywhere in the world, to architects, engineers, contractors, and building owners/developers who specialize in the commercial, industrial, and institutional markets.
The Greening the Heartland track will explore interdependent elements of sustainability. Green buildings are critical components in the design of sustainable communities that rely on pathways and infrastructure—watts, water, waste, and wheels. Providing buildings with clean energy, clean water, and efficient use of materials, while minimizing waste, results in truly green buildings and sustainable developments that bring people together to work, play, learn, and live.
All proposals must be submitted online at BuildingChicagoExpo.com. Submitters may return to their uploaded and saved proposals for editing any time up until the submission deadline of midnight, CST, February 28, 2014. Faxed or mailed proposals will not be accepted. For more information, contact Harry Urban, SGC/SGC Horizon vice president of events, at hurban@sgcmail.com; 847.954.7928.
Related Stories
| Nov 1, 2010
John Pearce: First thing I tell designers: Do your homework!
John Pearce, FAIA, University Architect at Duke University, Durham, N.C., tells BD+C’s Robert Cassidy about the school’s construction plans and sustainability efforts, how to land work at Duke, and why he’s proceeding with caution when it comes to BIM.
| Nov 1, 2010
Vancouver’s former Olympic Village shoots for Gold
The first tenants of the Millennium Water development in Vancouver, B.C., were Olympic athletes competing in the 2010 Winter Games. Now the former Olympic Village, located on a 17-acre brownfield site, is being transformed into a residential neighborhood targeting LEED ND Gold. The buildings are expected to consume 30-70% less energy than comparable structures.
| Oct 27, 2010
Grid-neutral education complex to serve students, community
MVE Institutional designed the Downtown Educational Complex in Oakland, Calif., to serve as an educational facility, community center, and grid-neutral green building. The 123,000-sf complex, now under construction on a 5.5-acre site in the city’s Lake Merritt neighborhood, will be built in two phases, the first expected to be completed in spring 2012 and the second in fall 2014.
| Oct 21, 2010
GSA confirms new LEED Gold requirement
The General Services Administration has increased its sustainability requirements and now mandates LEED Gold for its projects.
| Oct 18, 2010
World’s first zero-carbon city on track in Abu Dhabi
Masdar City, the world’s only zero-carbon city, is on track to be built in Abu Dhabi, with completion expected as early as 2020. Foster + Partners developed the $22 billion city’s master plan, with Adrian Smith + Gordon Gill Architecture, Aedas, and Lava Architects designing buildings for the project’s first phase, which is on track to be ready for occupancy by 2015.
| Oct 13, 2010
Editorial
The AEC industry shares a widespread obsession with the new. New is fresh. New is youthful. New is cool. But “old” or “slightly used” can be financially profitable and professionally rewarding, too.
| Oct 13, 2010
Test run on the HP Z200 SFF Good Value in a Small Package
Contributing Editor Jeff Yoders tests a new small-form factor, workstation-class desktop in Hewlett-Packard’s line that combines performance of its minitower machine with a smaller chassis and a lower price.
| Oct 13, 2010
Prefab Trailblazer
The $137 million, 12-story, 500,000-sf Miami Valley Hospital cardiac center, Dayton, Ohio, is the first major hospital project in the U.S. to have made extensive use of prefabricated components in its design and construction.
| Oct 13, 2010
Thought Leader
Sundra L. Ryce, President and CEO of SLR Contracting & Service Company, Buffalo, N.Y., talks about her firm’s success in new construction, renovation, CM, and design-build projects for the Navy, Air Force, and Buffalo Public Schools.