New Gensler report calls for workplace design that responds to employees’ ‘human emotions’
High performing offices are linked to how well they leverage amenities.
HORIZONTV FEATURING BD+C: WATCH EPISODES ON DEMAND AT HORIZONTV
High performing offices are linked to how well they leverage amenities.
For the first time ever, hotel to apartment conversion projects have overtaken office-to-residential conversions.
Biophilic design in the built environment supports the health and wellbeing of individuals, as they spend most of their time indoors.
In Henderson, Nev., a city roughly 15 miles southeast of Las Vegas, 100,000 sf of unused office space will be turned into an open-air retail development called The Cliff. The $30 million adaptive reuse development will convert the site’s two office buildings into a destination for retail stores, chef-driven restaurants, and community entertainment.
No longer marked by gray, uniform rows of cubicles, offices have become more personalized and employee-centric than ever, giving people a more comfortable place to spend their working hours. New approaches to office customization and the way employees interact are breathing new life into the workplace.
Gilbane to provide design build services for a new Lean manufacturing facility for Ocean Spray Cranberries Inc., beverage products.
The project is seeking LEED ID Silver certification from the U.S. Green Building Council.
The $1.2 million project consisted of a 16,000-sf interior renovation.
Architects and builders interested in developing water-efficient buildings invited to attend free sessions featuring experts discussing water-efficient building practices.
LEO A DALY, in collaboration with Local Design Institute WDCE, wins competition to design Phase 2, Plot B, of Campus.
Survey is based on opinions from 38 of the nation’s leading real estate economists and analysts and suggests a marked increase in commercial real estate activity, with total transaction volume expected to rise from $250 billion in 2012 to $312 billion in 2014.
LEED Platinum facility opens at NASA Ames Research Center at California’s Moffett Field.
Buro Happold’s structural design supports the top-heavy, complex building in a high seismic zone; engineers are using BIM technology to design a concrete structure with post-tensioned walls.
Thornton Tomasetti provided structural design services through construction administration to architect HOK for the 1.6-million-sf tower and tiara structure, which comprises 15 steel tube arches spanning approximately 158 feet horizontally and 130 feet vertically from the top of the main building roof.
To account for future expansion, Francis Cauffman developed a plan to accommodate the addition of an 8-story tower to the building.