In order to ensure that specified building products comply with codes and standards, building code officials should take into account the credentials of accrediting bodies, says Shahin Moinian, P.E., the president of ICC Evaluation Service.
First, code officials should make sure that the evaluation service provider is accredited with a scope of accreditation pertaining to the products they have evaluated. In addition, the evaluation service provider should be verified to be accredited and in good standing.
One important indicator is for the provider to be accredited to ISO/IEC 17065, the international standard for certification bodies. Code officials should also review the evaluation reports published by evaluation service providers to ensure that the report is published to a standard or criteria (not a collection of unspecified documents and opinions).
The report should also relate to the product and use of such products for the installation in question. “Code officials should look for the ICC-ES marking on building and plumbing products for peace of mind when approving products,” Moinian says.
Related Stories
Codes and Standards | Apr 23, 2020
COVID-19 epidemic demonstrates value of flexible hospital space
Some rooms being repurposed for ICU care.
Codes and Standards | Apr 15, 2020
Embodied carbon footprint can be reduced by using conventional materials
High-SCM concrete, and cellulose and wood fiber insulation among the greener alternatives.
Coronavirus | Apr 13, 2020
COVID-19 alert: City conducts a 'virtual building inspection' to allow Starbucks and bank to open
Bothell, Wash., issues a certificate of occupancy to developer after inspecting the property online.
Codes and Standards | Apr 13, 2020
Design competition focuses on reducing urban heat island effect
Cool Abu Dhabi aims to transform urban life in the Middle East.
Codes and Standards | Apr 13, 2020
What building science says about reducing COVID-19 transmission
Impact of temperature and relative humidity is unclear.
Codes and Standards | Apr 9, 2020
Owners retrofitting properties, monitoring performance during epidemic
Covid-19 outbreak may lead employers to reevaluate office commitments.
Codes and Standards | Apr 7, 2020
Dept. of Labor publishes guidance on paid sick leave, expanded family and medical leave
Includes fact sheets for employees, employers, and a questions and answers document.
Codes and Standards | Apr 1, 2020
Standards and codes meetings halted, postponed
ASTM International cancels in-person standards meetings; DOE’s National Energy Codes Conference postponed.
Codes and Standards | Mar 26, 2020
Ransomware attack on Canadian contractor underscores need for cybersecurity
Victimized company Bird Construction has defense, law enforcement contracts.
Codes and Standards | Mar 23, 2020
Contractors should scrutinize contracts carefully amid Covid-19 crisis
Compliance with time-sensitive notice requirements and careful documentation required.