flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Bruce E. Brooks Associates announces new commissioning subsidiary

Bruce E. Brooks Associates announces new commissioning subsidiary

Brooks + Wright Commissioning to be led by Will Wright.


By By BD+C Staff | May 1, 2012
Will Wright
Will Wright
This article first appeared in the June 2012 issue of BD+C.

Bruce E. Brooks & Associates Consulting Engineers (BBA), an MEP engineering firm, announced the formation of Brooks + Wright Commissioning, a NEBB-certified firm dedicated to verifying that building systems function effectively. Headed by Bruce E. Brooks, PE, LEED AP, and William A. Wright, LEED AP, ASHRAE CPMP, NEBB BSCP, the new firm will offer technical building commissioning for new construction and renovations, retro-commissioning for existing buildings and LEED-fundamental and enhanced commissioning.

With more than 14 years of direct industry experience in building commissioning and retro-commissioning, Wright is well-qualified to lead a team of skilled professionals. BD+C

Related Stories

Architects | Mar 23, 2021

Design firms KTGY, Simeone Deary Design Group unite to shape future of architectural design through experiential environments

With a bold vision to reshape how people experience spaces, residential design firm joins forces with interior design group, creating fully integrated architecture, branding, interiors and planning practice.

Architects | Mar 15, 2021

A life in architecture – Lessons from my father

A veteran designer looks back on the lessons his father, a contractor, taught him.

Architects | Mar 11, 2021

Calling all building design professionals: BD+C needs your expertise on design innovation in 2021

This new BD+C research project explores the leading drivers, sources of inspiration, and successful outcomes for design innovation projects and initiatives.  

Coronavirus | Mar 11, 2021

The Weekly show, March 11, 2021: 5 building products for COVID-related conditions, and AI for MEP design

This week on The Weekly show, BD+C editors speak with AEC industry leaders about building products and systems that support COVID-related conditions, and an AI tool that automates the design of MEP systems.

Laboratories | Mar 10, 2021

8 tips for converting office space to life sciences labs

Creating a successful life sciences facility within the shell of a former office building can be much like that old “square peg round hole” paradigm. Two experts offer important advice.

AEC Tech | Mar 4, 2021

The Weekly show, March 4, 2021: Bringing AI to the masses, and Central Station Memphis hotel

This week on The Weekly show, BD+C editors speak with AEC industry leaders about the award-winning Central Station Memphis hotel reconstruction project, and how Autodesk aims to bring generative design and AI tools to the AEC masses.

Architects | Mar 1, 2021

OMA designs 7-mile-long underwater sculpture park

The project will be completed in several phases.

Architects | Mar 1, 2021

AIA elevates 102 members to the College of Fellows

AIA fellowship recognizes significant contributions to the profession of architecture and society.

Market Data | Feb 24, 2021

2021 won’t be a growth year for construction spending, says latest JLL forecast

Predicts second-half improvement toward normalization next year.

boombox1
boombox2
native1

More In Category




Government Buildings

One of the country’s first all-electric fire stations will use no outside energy sources

Charlotte, N.C.’s new Fire Station #30 will be one of the country’s first all-electric fire stations, using no outside energy sources other than diesel fuel for one or two of the fire trucks. Multiple energy sources will power the station, including solar roof panels and geothermal wells. The two-story building features three truck bays, two fire poles, dispatch area, contamination room, and gear storage.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021