flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Brownfield goes green

Brownfield goes green

Chicago Center for Green Technology uses high-speed, energy-efficient hand dryers to share its green message and earn LEED credits.


June 4, 2012
The Chicago Center for Green Technology is the nations first rehabilitated muni
The Chicago Center for Green Technology is the nations first rehabilitated municipal building to receive LEED Platinum rating f

In 1995, the Chicago Department of Environment (CDOE) faced a formidable task. CDOE began clean-up of over 17 acres and 600,000 tons of concrete and construction debris dumped illegally by Sacramento Crushing, a company that was permitted to collect and recycle construction and demolition material but that had far exceeded the parameters of its permit.

The CDOE successfully fought Sacramento Crushing in court and not only closed down their operation but also became the owner of the site itself. By 1999, CDOE was the proud owner of a clean, uncontaminated site with a vacant building. Rather than simply renovating the structure using traditional building methods, they seized the opportunity to design and develop an environmentally sustainable building, using some of the most sophisticated green technology available. The CDOE enlisted the Chicago Chapter of the American Institute of Architects (AIA) Committee on the Environment and redesigned the building and property using LEED guidelines, as established by the USGBC.

Green from the ground up

The building, originally erected in 1952, now showcases over 40,000-sf of state-of-the-art environmental features including solar panels, rainwater collection for irrigation, recycled materials, smart lighting, a geothermal exchange system, and a green roof. It is the nation’s first rehabilitated municipal building to receive LEED Platinum rating from the USGBC.

The Center is home to a number of companies that focus on environmental and sustainable design. It also acts as a community resource and CDOE satellite office, offering a range of educational classes for professionals and homeowners and a testament that green technology is cost-effective and good for the environment.

Green never looked so good

Two years after opening, the Chicago Center for Green Technology installed high-speed XLERATOR hand dryers.

"With over 30,000 visitors per year, we were using an awful lot of paper towels," said Sarah Moloney, project coordinator for the City of Chicago. 

Unlike conventional hand dryers, which average 30 to 45 seconds of drying time, XLERATOR dries hands three times faster--completely in 10-15 seconds--and uses 80% less energy than conventional hand dryers. The hand dryer represents a 95% cost savings when compared to paper towels, reduces the need for maintenance, and improved restroom hygiene. It is also the only hand dryer that is Made in USA Certified, the first hand dryer to be GreenSpec Listed and helps facilities qualify for LEED credits.

In 2009, XLERATOR hand dryers with custom graphic covers were installed. These dryers include an educational “Good for the Environment” message for guests to read while drying their hands. In addition to offering superior functionality, the hand dryers’ sleek stainless steel covers compliment the facility’s modern design.

To meet the aesthetic needs of architects and designers, Excel Dryer Inc., manufacturer of XLERATOR, offers customers a wide range of finishes including traditional white, brushed stainless steel, vandalism-resistant bulk molded compound, fingerprint-resistant textured graphite, and other metallic finishes. +

Related Stories

| Jan 31, 2012

Suffolk Construction to manage Lawrence & Memorial Hospital Cancer Center project in Waterford, Conn.

Leading construction management firm overseeing one of first healthcare projects in the country to utilize innovative IPD process.

| Jan 31, 2012

Perkins Eastman’s Miller appointed Chairman of the AIA International Committee

International expertise leveraged as global industry resource.

| Jan 31, 2012

KBE selected for school project in Waterbury, Conn.

Located adjacent to the existing elementary school, the $28 million, 82,000 s/f Pre-K to eighth Grade school is expected to host its first students in the fall of 2013.

| Jan 31, 2012

Construction Law Firm Allensworth & Porter, LLP adds May to the firm

Prior to joining Allensworth & Porter, May served as the staff attorney for the Texas Civil Justice League, and was responsible for drafting, analyzing, and tracking civil justice and business-related legislation during the 82nd Legislative Session. 

| Jan 31, 2012

Skanska USA Civil promotes Bradley to southeast general superintendent

In Bradley’s new position, he will manage field operations for all Skanska Civil projects in the southeast.

| Jan 30, 2012

Siemens and Air-Ex Team deliver building controls training to Mt. San Antonio College students

Siemens contributes training modules and technology to support hands-on courses.

| Jan 30, 2012

Hollister Construction Services to renovate 30 Montgomery Street in Jersey City, N.J.

Owner Onyx Equities hires firm to oversee comprehensive upgrades of office building.

| Jan 27, 2012

Caterpillar reports record sales and profit for 4Q and full-year 2011

Momentum carries into 2012 with sales and revenues outlook raised to $68 to $72 billion.

| Jan 27, 2012

Smith Seckman Reid opens two new offices

Smith Seckman Reid, Inc. (SSR), an engineering design and facility consulting firm, has opened two new offices, one in Chicago, the other in Washington, D.C.

| Jan 27, 2012

BRB Architects designs new campus center for Molloy College

Intended to be the centerpiece of the College’s transformation from a commuter college to a 24-hour learning community, the “Public Square” will support student life with spaces such as a café, lounges, study rooms, student club space, a bookstore and an art gallery.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021