In 1995, the Chicago Department of Environment (CDOE) faced a formidable task. CDOE began clean-up of over 17 acres and 600,000 tons of concrete and construction debris dumped illegally by Sacramento Crushing, a company that was permitted to collect and recycle construction and demolition material but that had far exceeded the parameters of its permit.
The CDOE successfully fought Sacramento Crushing in court and not only closed down their operation but also became the owner of the site itself. By 1999, CDOE was the proud owner of a clean, uncontaminated site with a vacant building. Rather than simply renovating the structure using traditional building methods, they seized the opportunity to design and develop an environmentally sustainable building, using some of the most sophisticated green technology available. The CDOE enlisted the Chicago Chapter of the American Institute of Architects (AIA) Committee on the Environment and redesigned the building and property using LEED guidelines, as established by the USGBC.
Green from the ground up
The building, originally erected in 1952, now showcases over 40,000-sf of state-of-the-art environmental features including solar panels, rainwater collection for irrigation, recycled materials, smart lighting, a geothermal exchange system, and a green roof. It is the nation’s first rehabilitated municipal building to receive LEED Platinum rating from the USGBC.
The Center is home to a number of companies that focus on environmental and sustainable design. It also acts as a community resource and CDOE satellite office, offering a range of educational classes for professionals and homeowners and a testament that green technology is cost-effective and good for the environment.
Green never looked so good
Two years after opening, the Chicago Center for Green Technology installed high-speed XLERATOR hand dryers.
"With over 30,000 visitors per year, we were using an awful lot of paper towels," said Sarah Moloney, project coordinator for the City of Chicago.
Unlike conventional hand dryers, which average 30 to 45 seconds of drying time, XLERATOR dries hands three times faster--completely in 10-15 seconds--and uses 80% less energy than conventional hand dryers. The hand dryer represents a 95% cost savings when compared to paper towels, reduces the need for maintenance, and improved restroom hygiene. It is also the only hand dryer that is Made in USA Certified, the first hand dryer to be GreenSpec Listed and helps facilities qualify for LEED credits.
In 2009, XLERATOR hand dryers with custom graphic covers were installed. These dryers include an educational “Good for the Environment” message for guests to read while drying their hands. In addition to offering superior functionality, the hand dryers’ sleek stainless steel covers compliment the facility’s modern design.
To meet the aesthetic needs of architects and designers, Excel Dryer Inc., manufacturer of XLERATOR, offers customers a wide range of finishes including traditional white, brushed stainless steel, vandalism-resistant bulk molded compound, fingerprint-resistant textured graphite, and other metallic finishes. +
Related Stories
| Jun 28, 2013
Calculating the ROI of building enclosure commissioning
A researcher at Lawrence Berkeley National Laboratory calls building enclosure commissioning “the single-most cost-effective strategy for reducing energy, costs, and greenhouse gas emissions in buildings today.”
| Jun 28, 2013
A brief history of windows in America
Historic window experts from Hoffmann Architects look back at the origin of windows in the U.S.
| Jun 28, 2013
Building owners cite BIM/VDC as 'most exciting trend' in facilities management, says Mortenson report
A recent survey of more than 60 building owners and facility management professionals by Mortenson Construction shows that BIM/VDC is top of mind among owner professionals.
| Jun 27, 2013
Thermal, solar control designs can impact cooling loads by 200%, heating loads by 30%
Underestimating thermal bridging can greatly undermine a building’s performance contributing to heating load variances of up to 30% and cooling load variances of up to 200%, says the MMM Group.
| Jun 26, 2013
New York’s ‘Scaffold Law’ may be altered to place larger burden on workers
New York's Scaffold Law, which “places the burden of responsibility on the contractor to prove that the job site was safe for workers,” could be facing a major change.
| Jun 26, 2013
Commercial real estate execs eye multifamily, retail sectors for growth, says KPMG report
The multifamily, retail, and hospitality sectors are expected to lead commercial building growth, according to the 2013 KPMG Commercial Real Estate Outlook Survey.
| Jun 25, 2013
Mirvish, Gehry revise plans for triad of Toronto towers
A trio of mixed-use towers planned for an urban redevelopment project in Toronto has been redesigned by planners David Mirvish and Frank Gehry. The plan was announced last October but has recently been substantially revised.
| Jun 25, 2013
First look: Herzog & de Meuron's Jade Signature condo tower in Florida
Real estate developer Fortune International has released details of its new Jade Signature property, to be developed in Sunny Isles Beach near Miami. The luxury waterfront condo building will include 192 units in a 57-story building near high-end retail destinations and cultural venues.
| Jun 25, 2013
DC commission approves Gehry's redesign for Eisenhower memorial
Frank Gehry's updated for a new Dwight D. Eisenhower memorial in Washington, D.C., has been approved by the Eisenhower Memorial Commission, reports the Washington Post. The commission voted unanimously to approve the $110 million project, which has been gestating for 14 years.
| Jun 21, 2013
AIA report: Greater collaboration, stiffer competition among top trends in architecture
A new 34-page report from AIA highlights key trends in the architecture marketplace and their impact on business and growth.