In 1995, the Chicago Department of Environment (CDOE) faced a formidable task. CDOE began clean-up of over 17 acres and 600,000 tons of concrete and construction debris dumped illegally by Sacramento Crushing, a company that was permitted to collect and recycle construction and demolition material but that had far exceeded the parameters of its permit.
The CDOE successfully fought Sacramento Crushing in court and not only closed down their operation but also became the owner of the site itself. By 1999, CDOE was the proud owner of a clean, uncontaminated site with a vacant building. Rather than simply renovating the structure using traditional building methods, they seized the opportunity to design and develop an environmentally sustainable building, using some of the most sophisticated green technology available. The CDOE enlisted the Chicago Chapter of the American Institute of Architects (AIA) Committee on the Environment and redesigned the building and property using LEED guidelines, as established by the USGBC.
Green from the ground up
The building, originally erected in 1952, now showcases over 40,000-sf of state-of-the-art environmental features including solar panels, rainwater collection for irrigation, recycled materials, smart lighting, a geothermal exchange system, and a green roof. It is the nation’s first rehabilitated municipal building to receive LEED Platinum rating from the USGBC.
The Center is home to a number of companies that focus on environmental and sustainable design. It also acts as a community resource and CDOE satellite office, offering a range of educational classes for professionals and homeowners and a testament that green technology is cost-effective and good for the environment.
Green never looked so good
Two years after opening, the Chicago Center for Green Technology installed high-speed XLERATOR hand dryers.
"With over 30,000 visitors per year, we were using an awful lot of paper towels," said Sarah Moloney, project coordinator for the City of Chicago.
Unlike conventional hand dryers, which average 30 to 45 seconds of drying time, XLERATOR dries hands three times faster--completely in 10-15 seconds--and uses 80% less energy than conventional hand dryers. The hand dryer represents a 95% cost savings when compared to paper towels, reduces the need for maintenance, and improved restroom hygiene. It is also the only hand dryer that is Made in USA Certified, the first hand dryer to be GreenSpec Listed and helps facilities qualify for LEED credits.
In 2009, XLERATOR hand dryers with custom graphic covers were installed. These dryers include an educational “Good for the Environment” message for guests to read while drying their hands. In addition to offering superior functionality, the hand dryers’ sleek stainless steel covers compliment the facility’s modern design.
To meet the aesthetic needs of architects and designers, Excel Dryer Inc., manufacturer of XLERATOR, offers customers a wide range of finishes including traditional white, brushed stainless steel, vandalism-resistant bulk molded compound, fingerprint-resistant textured graphite, and other metallic finishes. +
Related Stories
Healthcare Facilities | Mar 16, 2015
Healthcare planning in a post-ACA world: 3 strategies for success
Healthcare providers are seeking direction on how to plan for a value-based world while still very much operating in a volume-based market. CBRE Healthcare's Curtis Skolnick offers helpful strategies.
Resort Design | Mar 16, 2015
Giancarlo Zema Design Group unveils plans for semi-submerged resort in Qatar
The resort will have four semi-submerged hotels that look similar to super-yachts, each including 75 luxury suites with private terraces.
Mixed-Use | Mar 13, 2015
Dubai announces mega waterfront development Aladdin City
Planned on 4,000 acres in the Dubai Creek area, the towers will be covered in gold lattice and connected via air-conditioned bridges.
Contractors | Mar 13, 2015
Construction materials prices rise for first time in six months
The largest monthly gain in petroleum prices in over three years caused construction materials prices to expand 0.4% in February, ending a six-month streak when prices failed to rise, according to the Bureau of Labor Statistics.
High-rise Construction | Mar 12, 2015
Developers confirm Renzo Piano’s contribution in Sydney harbor overhaul
If the entire development is approved, One Sydney Harbour will be Piano’s second project in Australia.
High-rise Construction | Mar 12, 2015
Foster and Partners designs 'The One' in Toronto
Developer Sam Mizrahi worked with Foster and Partners and Core Architects to design Toronto's tallest skyscraper aside from the CN Tower, The One, which will house a luxury shopping mall and condos.
Contractors | Mar 12, 2015
Construction demand exploding in 2015, but costs complicate recovery
Raw materials and labor costs temper expectations for soaring profits.
Codes and Standards | Mar 12, 2015
Energy Trust of Oregon offers financial incentives for net-zero buildings
The organization is offering technical assistance along with financial benefits.
BIM and Information Technology | Mar 11, 2015
Google plans to use robots, cranes to manipulate modular offices at its new HQ
Its visions of “crabots” accentuate the search-engine giant’s recent fascination with robotics and automation.
Sports and Recreational Facilities | Mar 11, 2015
Foster + Partners wins bid for 2022 World Cup centerpiece stadium in Qatar
Norman Foster described the design as “an exciting step forward in stadium design—it will be the first to break the mold of the free-standing suburban concept, and instead anticipates the grid of this future city.”