flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Bronze Award: Alumni Gymnasium Renovation, Dartmouth College Hanover, N.H.

Bronze Award: Alumni Gymnasium Renovation, Dartmouth College Hanover, N.H.


August 11, 2010
This article first appeared in the 200810 issue of BD+C.
The centerpiece of the $12.8 million renovation project is the conversion of the building’s dark, dank second-floor gymnasium into a light-filled fitness center. The 17,000-sf fitness center features all the amenities of a modern workout center—cardio machines, free-weight stations, circuit machines, dumbbells, a spinning room, and workout and classroom space—all situated snugly within the historic gymnasium.
        
At a time when institutions of higher learning are spending tens of millions of dollars erecting massive, cutting-edge recreation and fitness centers, Dartmouth College in Hanover, N.H., decided to take a more modest, historical approach.

Instead of building an ultra-grand new facility, the university chose to
    
To meet ADA accessibility standards, the Building Team created a new, universally accessible route to the front door that maintains the historic character of the entrance. A long, sweeping walkway designed at less than a 1:20 slope permits easy access to the building and is free of obtrusive railings.
       
The gym’s 1970s-era suspended ceiling system was removed to reveal 10 steel trusses that now cap the space in dramatic fashion.
         
breathe new life into its landmark Alumni Gymnasium by transforming the outdated 99-year-old facility into a state-of-the-art fitness and recreation center. 

The centerpiece of the $12.8 million renovation project is the conversion of the building’s dark, dank second-floor gymnasium into a light-filled fitness center. Designed by Lavallee Brensinger Architects of Manchester, N.H., the 17,000-sf fitness center features all the amenities of a modern workout center—cardio machines, free-weight stations, circuit machines, dumbbells, a spinning room, and workout and classroom space—all situated snugly within the historic gymnasium. 

The gym’s 1970s-era suspended ceiling system was removed to reveal 10 steel trusses that now cap the space in dramatic fashion. During the day, natural light floods the interior through replacement clerestory windows that mimic the originals. At night, the interior lighting scheme highlights the massive trusses and emphasizes the vast volume of the space.

To meet ADA accessibility standards, the Building Team created a new, universally accessible route to the front door that maintains the historic character of the entrance. A long, sweeping walkway designed at less than a 1:20 slope permits easy access to the building and is free of obtrusive railings. The original tri-part front steps were replaced with a wider, front-entrance staircase that can better handle crowds during periods of peak use.

Inside, a new oversized elevator provides access to all public floors of the building. The elevator also serves as a key design element of the lobby and fitness center, with detailed enclosures at each level.

The Reconstruction Awards judges praised Dartmouth for reviving the campus landmark and were especially pleased with the university’s decision to have the building live on as center for fitness and recreation. 

“There are so many facilities like this that have been converted for different use,” said Reconstruction Awards honorary chair Walker C. Johnson, FAIA, principal with Johnson Lasky Architects, Chicago. “I like the fact that they chose to update it for its original use.”
        

Project Summary
Alumni Gymnasium Renovation, Dartmouth College
Hanover, N.H.

Building Team
Submitting firm:
Lavallee Brensinger Architects (architect, interior architect)
Associate architect: HOK Sport
Structural engineer: McFarland Johnson Inc.
Mechanical/electrical engineer: Hallam-ICS
Construction manager: North Branch Construction

General Information
Size: 140,000 sf
Construction cost: $12.8 million
Delivery method: CM at risk

Related Stories

Performing Arts Centers | May 4, 2016

Diamond Schmitt unveils designs for Buddy Holly Hall performing arts center

The spacious and versatile complex can hold operas, plays, rock concerts, and conferences.  

Cultural Facilities | May 4, 2016

World’s largest cultural center planned for Dubai

The Opera District will have a 2,000-seat theater and three residential complexes.  

Cultural Facilities | Apr 28, 2016

Studio Dror designs geodesic dome to pair with the Montreal Biosphère

The aluminum dome, which honors the 50th anniversary of Expo 67, can host events year-round.

Cultural Facilities | Apr 25, 2016

Two milestones recognized as Diamond Schmitt designs upgrades to the National Arts Centre in Ottawa

Renovations, including a new tower, stage, and lounge, will be completed in 2017, the year of Canada’s 150th and the center’s 50th birthday.  

Cultural Facilities | Apr 12, 2016

Studio Libeskind designs angular Kurdish museum rich with symbolism

The museum consists of four geometric volumes separated by somber and uplifting divisions.

Performing Arts Centers | Apr 1, 2016

Adrian Smith + Gordon Gill Architecture’s The Yard at Chicago Shakespeare to begin construction this spring at Navy Pier

Among the unique design features is a movable set of structural audience “towers” that allows for directors and designers to create a space that works best for their specific performances.

Sports and Recreational Facilities | Mar 31, 2016

An extreme sports tower for climbing and BASE jumping is proposed for Dubai’s waterfront

The design incorporates Everest-like base camps for different skill levels.

Cultural Facilities | Mar 21, 2016

PAB Architects designs marketplace to centralize Senegal street vending

The Senegal City Market project consists of groups of store modules and is expected to expand to 13 cities.

Cultural Facilities | Mar 15, 2016

OMA’s first UAE project transforms warehouses into multi-purpose art district venue

Moveable walls will provide different spatial configurations for events and gatherings, and large glass doors will blur indoors and outdoors.

Cultural Facilities | Mar 8, 2016

The sexy side of universal design

What would it look like if achieving universal accessibility was an inspiring point of departure for a project's design process? Sasaki's Gina Ford focuses on Marina Plaza and the Cove, two key features of her firm's Chicago Riverwalk development.

boombox1
boombox2
native1

More In Category

Adaptive Reuse

Detroit’s Michigan Central Station, centerpiece of innovation hub, opens

The recently opened Michigan Central Station in Detroit is the centerpiece of a 30-acre technology and cultural hub that will include development of urban transportation solutions. The six-year adaptive reuse project of the 640,000 sf historic station, created by the same architect as New York’s Grand Central Station, is the latest sign of a reinvigorating Detroit.


Museums

Connecticut’s Bruce Museum more than doubles its size with a 42,000-sf, three-floor addition

In Greenwich, Conn., the Bruce Museum, a multidisciplinary institution highlighting art, science, and history, has undergone a campus revitalization and expansion that more than doubles the museum’s size. Designed by EskewDumezRipple and built by Turner Construction, the project includes a 42,000-sf, three-floor addition as well as a comprehensive renovation of the 32,500-sf museum, which was originally built as a private home in the mid-19th century and expanded in the early 1990s. 



Cultural Facilities

Multipurpose sports facility will be first completed building at Obama Presidential Center

When it opens in late 2025, the Home Court will be the first completed space on the Obama Presidential Center campus in Chicago. Located on the southwest corner of the 19.3-acre Obama Presidential Center in Jackson Park, the Home Court will be the largest gathering space on the campus. Renderings recently have been released of the 45,000-sf multipurpose sports facility and events space designed by Moody Nolan.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021