flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

A brief history of windows in America

A brief history of windows in America

Historic window experts from Hoffmann Architects look back at the origin of windows in the U.S.


By Hoffmann Architects | June 28, 2013
It’s easy to lose sight of the significance of historic windows when all they seem to contribute to the building aesthetic is peeling paint, rotting wood, corroding steel, or broken glass. To appreciate the architectural worth of aging windows, we must look back, briefly, at their origins.
 
The earliest American windows were wood casement windows, hinged at the sides. By the early 1800s, sliding single- and double-hung windows had come into popular use. However, devastating fires in a number of U.S. cities during the late 19th century led to the widespread adoption of strict fire codes, which decreased the prevalence of wood windows.
 
At the same time, the Industrial Revolution brought about major advances in rolled steel, permitting the mass production of steel windows. These fire-resistant frames and sashes became the standard for factories and commercial buildings, as well as for larger residential and university buildings, while wood windows continued to dominate the single-family residential market.
 
Steel remained the primary material for industrial, commercial, and institutional windows in the United States well into the 20th century. The strength of steel permitted larger expanses of glass, which enabled the thin profiles and repeated window patterns of Art Deco and early Modernist buildings. Then, after World War II, aluminum windows gained popularity due to their lower price and non-corroding properties. Toward the end of the 20th century, wood windows also fell out of fashion, as many homeowners replaced the original windows on their turn-of-the-century houses with vinyl, both for its inexpensiveness and for its promise of minimal maintenance.
 
Unfortunately, the replacement of original wood or steel windows with cheaper materials can significantly impact building appearance. Aluminum, for example, is much weaker than steel, requiring bulkier frame profiles that can destroy the delicate look afforded by multi-pane steel windows. Likewise, vinyl may discolor and warp over time, making it a far less durable material over the long term than the original wood.
 
The good news for building owners is that options for treating deteriorated historic windows are plentiful. Energy-saving retrofits, repair, or parts replacement can restore existing windows to like-new functional condition. Should replacement be called for, it is often possible to locate or custom-make historic replicas that won’t compromise building character.

Related Stories

| Mar 7, 2012

Firestone iPad app offers touch technology

Free app provides a preview of Firestone’s Roots to Rooftop Building Envelope Solution with an overview of all the products from ground and stormwater management solutions, to complete wall panel and commercial roofing system applications.

| Mar 7, 2012

LEO A DALY opens new office in Riyadh, Saudi Arabia

Jay N. Kline, Regional Manager – Saudi Arabia, to lead new office.

| Mar 7, 2012

Turner appointed Batson-Cook CFO and treasurer

Cecil G. Hood to continue in advisory role.

| Mar 7, 2012

Thornton Tomasetti names Dowdall VP of Kansas City office

Dowdall will be responsible for supporting the Property Loss Consulting, Building Performance and Building Sustainability practices nationally.

| Mar 7, 2012

LEO A DALY selected to design Minnesota Fallen Firefighters Memorial

The bronze, figurative sculpture of a firefighter rescuing a child, which is currently on display at the Minneapolis/St. Paul International Airport, is lit by natural light through a circular void in the monolith.

| Mar 7, 2012

Houlihan Lokey adds Steffen to Industrials Group

Steffen bolsters group with experience in the building materials and rorest product sectors.

| Mar 6, 2012

Country’s first Green House home for veterans completed

Residences at VA Danville to provide community-centered housing for military veterans.

| Mar 6, 2012

EwingCole completes first design-build project for the USMA

The second phase of the project, which includes the academic buildings and the lacrosse and football fields, was completed in January 2012.

| Mar 6, 2012

Gensler and Skender complete new corporate headquarters for JMC Steel in Chicago

Construction was completed by Skender in just 12 weeks.

| Mar 6, 2012

BLT Architects promotes two to associate

Architect Nicole Dress and interior designer Jessica Moser acknowledged for excellence.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021