A new Brick Industry Association (BIA) study found that brick with Concrete Masonry Units (CMUs) costs less than precast concrete, metal panel curtain wall, and glass panel curtain wall systems.
The study compared total construction costs in five categories: three-story office building, three-story apartment building, five-to 10-story office building, four- to eight-story hospital, and a six-story dorm. The independent study was conducted by RSMeans for the BIA, according to a news release.
Comparisons include exterior installation and finish systems (EIFS) with metal studs (lowest cost), brick with steel studs, manufactured stone with steel studs, brick with CMU, precast concrete, metal panel curtain wall and glass panel curtain wall. For example, a three-story office building using manufactured stone with steel studs costs 2.7% more than brick with steel studs. In that application, precast concrete costs 2.7% more than brick with CMU, and metal panel curtain wall costs 13.1% more than brick with CMU.
"National averages show brick costs less than perceived," said Ray Leonhard, BIA's president and CEO. "Since it's a non-flammable and non-combustible material, clay brick also offers superior fire resistance with a minimum one-hour fire rating."
Related Stories
| Feb 20, 2012
Comment period for update to USGBC's LEED Green Building Program now open
This third draft of LEED has been refined to address technical stringency and rigor, measurement and performance tools, and an enhanced user experience.
| Feb 20, 2012
GAF introduces web portal for architects and specifiers
The new portal offers a clean look with minimal clutter to make it easier to find the technical information and product data that architects need.
| Feb 17, 2012
AGC advocates for federal procurement reform
Ensure that small business goals take into consideration actual small business capacity in relevant specialty markets.
| Feb 17, 2012
Codes not to blame for Anchorage roof collapses following heavy snows
Design or construction problems likely contributed to the collapses, according to city officials.
| Feb 17, 2012
Comment period opens March 1 for LEED 2012 update
USGBC says that LEED's strength comes from its continuous evolution.
| Feb 17, 2012
OSHA training videos on proper respirator use available online
17 short videos to help workers learn about the proper use of respirators on the job.
| Feb 17, 2012
Union/employer collaboration on the rise aimed at exceeding OSHA safety standards
Unions have learned to help employers win contracts with bids made competitive through good safety practices.
| Feb 16, 2012
Gain greater agility and profitability with ArchiCAD BIM software
White paper was written with the sole purpose of providing accurate, reliable information about critical issues related to BIM and what ArchiCAD with advanced technology such as the GRAPHISOFT BIM Server provide as an answer to address these issues.
| Feb 9, 2012
Initiative to sell off under-used federal property gaining momentum
The bill is similar to a White House planto cut $8 billion worth of building costs by the end of the 2012 fiscal year, and to establish a panel to identify other sites worth selling or donating to nonprofits or state and local governments.