flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Brick Industry Assn. study finds brick buildings cost less than precast, metal, and glass

Codes and Standards

Brick Industry Assn. study finds brick buildings cost less than precast, metal, and glass

The study compares costs in five categories of construction.


By Peter Fabris, Contributing Editor | March 22, 2017

Pixabay Public Domain

A new Brick Industry Association (BIA) study found that brick with Concrete Masonry Units (CMUs) costs less than precast concrete, metal panel curtain wall, and glass panel curtain wall systems.

The study compared total construction costs in five categories: three-story office building, three-story apartment building, five-to 10-story office building, four- to eight-story hospital, and a six-story dorm. The independent study was conducted by RSMeans for the BIA, according to a news release.

Comparisons include exterior installation and finish systems (EIFS) with metal studs (lowest cost), brick with steel studs, manufactured stone with steel studs, brick with CMU, precast concrete, metal panel curtain wall and glass panel curtain wall. For example, a three-story office building using manufactured stone with steel studs costs 2.7% more than brick with steel studs. In that application, precast concrete costs 2.7% more than brick with CMU, and metal panel curtain wall costs 13.1% more than brick with CMU.

"National averages show brick costs less than perceived," said Ray Leonhard, BIA's president and CEO. "Since it's a non-flammable and non-combustible material, clay brick also offers superior fire resistance with a minimum one-hour fire rating."

Related Stories

| Jul 19, 2012

Bayview Property Managers agrees to record $800,000 building code fine

A San Francisco property-management company has agreed to pay a record $800,000 civil fine for hundreds of building code violations at rental properties.

| Jul 19, 2012

Glass ‘biodome’ helps Parkview Green FangCaoDi project in Beijing achieve LEED Platinum

A glass envelope acting as a kind of biodome encapsulates four mixed-use towers at Parkview Green FangCaoDi, an 800,000 sf mixed-use development in Beijing. The glass structure helped the development to achieve LEED Platinum certification.

| Jul 19, 2012

UMass-Boston's Bevington: 'Financing alternatives crucial to energy-efficiency upgrades'

It’s conceivable that innovation in project finance can do for building efficiency in the coming century what 30-year mortgages did for home ownership in the last, this article asserts.  

| Jul 19, 2012

NYC eases building code to create ‘micro apartments’ in Kips Bay

New York City has implemented a program to encourage construction of "micro-apartments" in the Big Apple, where rents are exorbitant and the number of singles is on the rise.

| Jul 19, 2012

NRCA: Roofing insulation performance, local climate keys to computing R-value

To minimize the loss of thermal resistance in design, the R-value of roof insulation should be computed based on the actual performance of the insulation material and the local climate, says the National Roofing Contractors Association.

| Jul 16, 2012

Business school goes for maximum vision, transparency, and safety with fire rated glass

Architects were able to create a 2-hour exit enclosure/stairwell that provided vision and maximum fire safety using fire rated glazing that seamlessly matched the look of other non-rated glazing systems.

| Jul 12, 2012

Federal budget chief to explain impact of pending defense cuts before Congress

Office of Management and Budget Director Jeffrey Zients is scheduled to testify before the House Armed Services Committee Aug. 1 to explain the possible effects of $500 billion in defense cuts on U.S. companies, including those in the design and construction industry.

| Jul 12, 2012

Pennsylvania legislature moves to prevent undocumented workers on public construction projects

Legislation to prevent undocumented workers from being hired by construction companies working on state-funded projects passed the Pennsylvania Legislature.

| Jul 12, 2012

New York’s One Bryant Park Bank of America tower is first new high-rise to achieve LEED Platinum

The new One Bryant Park Bank of America tower in midtown Manhattan is the first new commercial high-rise to achieve LEED Platinum certification.

| Jul 12, 2012

OSHA launches campaign to prevent heat illness

The Occupational Safety and Health Administration has launched its 2012 Heat Illness Prevention Campaign to educate employees and their employers about the hazards of working outdoors in heat, and how to prevent heat-related illnesses.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021