flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Brick Industry Assn. study finds brick buildings cost less than precast, metal, and glass

Codes and Standards

Brick Industry Assn. study finds brick buildings cost less than precast, metal, and glass

The study compares costs in five categories of construction.


By Peter Fabris, Contributing Editor | March 22, 2017

Pixabay Public Domain

A new Brick Industry Association (BIA) study found that brick with Concrete Masonry Units (CMUs) costs less than precast concrete, metal panel curtain wall, and glass panel curtain wall systems.

The study compared total construction costs in five categories: three-story office building, three-story apartment building, five-to 10-story office building, four- to eight-story hospital, and a six-story dorm. The independent study was conducted by RSMeans for the BIA, according to a news release.

Comparisons include exterior installation and finish systems (EIFS) with metal studs (lowest cost), brick with steel studs, manufactured stone with steel studs, brick with CMU, precast concrete, metal panel curtain wall and glass panel curtain wall. For example, a three-story office building using manufactured stone with steel studs costs 2.7% more than brick with steel studs. In that application, precast concrete costs 2.7% more than brick with CMU, and metal panel curtain wall costs 13.1% more than brick with CMU.

"National averages show brick costs less than perceived," said Ray Leonhard, BIA's president and CEO. "Since it's a non-flammable and non-combustible material, clay brick also offers superior fire resistance with a minimum one-hour fire rating."

Related Stories

Codes and Standards | Sep 14, 2017

Gentrification means a new mindset for city planners

Rising rents elicit reexamination of zoning principles.

Codes and Standards | Sep 13, 2017

OSHA issues extension for compliance with crane operator certification requirements

Comments on proposed rule sought through Sept. 29.

Codes and Standards | Sep 12, 2017

Washington, D.C. is first LEED Platinum city in the world

All city government buildings are powered by renewables.

Codes and Standards | Sep 11, 2017

Natural solutions would be most effective flood resilience policies for Houston

New green infrastructure should be part of rebuild.

Codes and Standards | Sep 8, 2017

Los Angeles luxury high-rise is first U.S. apartment building to achieve WELL Multifamily certification

Hollywood Proper Residences have verified indoor air and water quality features.

Codes and Standards | Sep 7, 2017

More than half of Houston properties at high or moderate risk of flooding are not in FEMA flood zone

Properties outside of these zones are not required to carry flood insurance.

Codes and Standards | Sep 6, 2017

Seventy percent of contractors have trouble finding workers

AGC survey indicates that fewer companies may be able to bid on projects.

Codes and Standards | Sep 5, 2017

New CTBUH initiatives to investigate link between fire and façades

In wake of Grenfell tragedy, Council forms new workgroup.

Codes and Standards | Sep 1, 2017

U.S. markets with the largest hotel construction pipeline

New York has the largest hotel construction pipeline of any U.S. market.

Codes and Standards | Aug 30, 2017

Trump rescinds elevation requirements for federally funded buildings and infrastructure

Flood protection on subsidized housing, hospitals, and other public buildings rolled back.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021