flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Boston’s plans to hold back rising seawater stall amid real estate slowdown

Codes and Standards

Boston’s plans to hold back rising seawater stall amid real estate slowdown

Dependence on private developers halts projects that include berms, sea walls.


By Peter Fabris, Contributing Editor | April 8, 2024
Image by usmc0491 from Pixabay

Image by usmc0491 from Pixabay

Boston has placed significant aspects of its plan to protect the city from rising sea levels on the actions of private developers. Amid a post-Covid commercial development slump, though, efforts to build protective infrastructure have stalled.

When officials approved major projects, they hoped that infrastructure improvements would both protect new developments and prevent flood waters from penetrating low-lying neighborhoods around them. Projects that include features such as sea walls, berms, and elevated land have been put on hold by a global real estate downturn that has made it difficult to finance large projects.

Inaction on planned coastal resilience infrastructure raises questions about the city’s plan of leaning on the private sector to help pay for an essential public good, according to a report in the Boston Globe. Most of the city’s coastline is privately held or controlled, leaving the city little other option than to partner with private landowners.

Prior to the pandemic, Boston was in the midst of a development boom in the Seaport district and other coastal locations, but the construction climate has cooled recently.

Related Stories

Codes and Standards | Mar 23, 2017

New manual of IT connectivity guidelines for commercial developments, redevelopments released

Mobile capacity planning, conduit points of entry, and electrical resiliency are covered.

Codes and Standards | Mar 22, 2017

Brick Industry Assn. study finds brick buildings cost less than precast, metal, and glass

The study compares costs in five categories of construction.

Codes and Standards | Mar 21, 2017

Calif. shopping center is first to earn BREEAM USA In-Use certification

The certification measures and monitors environmental performance of existing buildings.

Codes and Standards | Mar 20, 2017

Professional liability insurance rates for architects and engineers expected to be stable in 2017

Premiums leveled off in 2015, and claims have been stable, helping to hold costs down.

Codes and Standards | Mar 15, 2017

Energy Star program at risk

The standard-setting initiative for energy-efficient products may be a victim of Trump budget cuts.

Codes and Standards | Mar 13, 2017

U.S. House and Senate have voted to repeal Dept. of Labor’s 'blacklisting' rule

The rule mandates labor compliance review for federal construction contractors.

Codes and Standards | Mar 9, 2017

WiredScore forms Connectivity Advisory Committee

The committee's creation is an important step forward for the group that evaluates internet connectivity in buildings.

Codes and Standards | Mar 8, 2017

New guide examines multifamily high-performance ventilation

The focus is on cost and performance of various systems.

Codes and Standards | Mar 7, 2017

Canada’s national building codes will encompass effects of climate change

Forecasted data, not historical data, will be used as the basis for the codes.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021