Boston’s Old South Church is the latest aggrieved party in a simmering battle for sunshine amid a downtown building boom.
The 142-year-old church is two blocks away from a planned tower at Back Bay Station, a subway and commuter rail stop. Representatives for the church are concerned that shadows from the planned 365-foot tall structure would cause moisture damage to masonry and darken stained-glass windows.
Old South Church has asked the developer for $19 million in mitigation funds, with $4 million going toward repairs to the church. The remaining $15 million would go to a citywide fund for affordable home-ownership programs.
Boston Properties, the developer, says the fee is exorbitant, and that impact studies don’t support the church’s fears, though a preservation architect quoted by the Boston Globe says the concerns are warranted. The company plans $72 million in upgrades to the train station and surrounding area as part of a $1 billion project consisting of three office and apartment towers and a garage over the Massachusetts Turnpike.
The Boston Planning & Development Agency hasn’t made a decision on the church’s request, and has delayed a vote on the project while church officials and the developer continue discussions. In a related matter, the state passed a law earlier this year that allows more shade from buildings on Boston Common, a move that would allow construction of a proposed 700-foot tall tower above an old parking garage.
Related Stories
Codes and Standards | Jul 22, 2020
New version of IAPMO’s Water Demand Calculator is available
Enhanced features include selection between single- and multifamily buildings.
Codes and Standards | Jul 22, 2020
Mobile app calculates sound transmission for wood-framed assemblies
American Wood Council tool for floor-ceiling assemblies.
Codes and Standards | Jul 22, 2020
Architecture billings remain in negative territory, begin to stabilize
Fewer architecture firms report declining billings this month.
Codes and Standards | Jul 20, 2020
N.Y. construction firm to pay $1.5 million to settle sexual harassment claim
Managers said to demand sex for pay and OT opportunities.
Codes and Standards | Jul 16, 2020
Tips to make optimal use of salvaged materials
Integrated teams, staging warehouse, and looking early and often, among recommendations.
Codes and Standards | Jul 15, 2020
Georgia gives the go-ahead for tall mass timber construction
Standards review scheduled to be completed by July 2021.
Codes and Standards | Jul 15, 2020
Softwood-lumber duties boost expenses amid COVID-19 outbreak
Little hope this year for resolution of trade dispute with Canada.
Codes and Standards | Jul 14, 2020
Metal Construction Assn. releases three EPD updates
Pertain to Metal Composite Materials, Insulated Metal Panels, and Roll Formed Aluminum and Steel Cladding.
Codes and Standards | Jul 13, 2020
5 must reads for the AEC industry today: July 13, 2020
4 technologies for improving building sanitation and tech's ever-evolving impact on the multifamily space.
Codes and Standards | Jul 9, 2020
Funding opportunity for field validation of high-impact building technologies
Dept. of Energy program targets dynamic interactions with electric grid.