Boston’s Old South Church is the latest aggrieved party in a simmering battle for sunshine amid a downtown building boom.
The 142-year-old church is two blocks away from a planned tower at Back Bay Station, a subway and commuter rail stop. Representatives for the church are concerned that shadows from the planned 365-foot tall structure would cause moisture damage to masonry and darken stained-glass windows.
Old South Church has asked the developer for $19 million in mitigation funds, with $4 million going toward repairs to the church. The remaining $15 million would go to a citywide fund for affordable home-ownership programs.
Boston Properties, the developer, says the fee is exorbitant, and that impact studies don’t support the church’s fears, though a preservation architect quoted by the Boston Globe says the concerns are warranted. The company plans $72 million in upgrades to the train station and surrounding area as part of a $1 billion project consisting of three office and apartment towers and a garage over the Massachusetts Turnpike.
The Boston Planning & Development Agency hasn’t made a decision on the church’s request, and has delayed a vote on the project while church officials and the developer continue discussions. In a related matter, the state passed a law earlier this year that allows more shade from buildings on Boston Common, a move that would allow construction of a proposed 700-foot tall tower above an old parking garage.
Related Stories
| Feb 9, 2012
Webinar focuses on lessons learned from LEED-certified industrial project
A Construction Specifications Institute webinar will focus on the lessons learned through the design and construction of a LEED-certified industrial project, Better Living Mill Shop, the first industrial building in Central Virginia to earn LEED certification.
| Feb 8, 2012
California likely to eliminate redevelopment agencies
Leaders of California cities had been trying to fashion a compromise with lawmakers after the state Supreme Court ruled the state had the authority to eliminate the agencies and use their property tax money for local services.
| Feb 8, 2012
Project aimed at economical seismic retrofits on historic Memphis structures
The group will develop a low-cost seismic retrofit model that would benefit aging brick-and-mortar structures. It involves bolting steel brackets to existing wooden floor and ceiling joists.
| Feb 8, 2012
Houston signs on to Better Buildings Challenge
The challenge has about $4 billion in federal and private-sector funds, which it will use for building energy upgrades nationwide in the next two years.
| Feb 8, 2012
OSHA offers free health and safety consulting for small businesses
The consultants offer confidential, non-punitive advice.
| Feb 8, 2012
Controversy over pay for prisoners on roofing job in Michigan
The disagreement was over whether the prisoners should have been paid prevailing wage for their brief time on the job because the project was paid for with a U.S. Department of Energy grant.
| Jan 30, 2012
ZigBee and ISO 50001: Two new standards to make buildings greener
These developments demonstrate the dynamic nature of the market and the continued need for development of program standards of many different types that help builders and owners translate high performance and sustainable buildings goals into practical measures on the ground.
| Jan 30, 2012
New firm-fixed-price rules on federal contracts impact construction industry
Contractors will need to be on the lookout for policies such as the Contractor Accountability for Quality clause.