Boston’s Old South Church is the latest aggrieved party in a simmering battle for sunshine amid a downtown building boom.
The 142-year-old church is two blocks away from a planned tower at Back Bay Station, a subway and commuter rail stop. Representatives for the church are concerned that shadows from the planned 365-foot tall structure would cause moisture damage to masonry and darken stained-glass windows.
Old South Church has asked the developer for $19 million in mitigation funds, with $4 million going toward repairs to the church. The remaining $15 million would go to a citywide fund for affordable home-ownership programs.
Boston Properties, the developer, says the fee is exorbitant, and that impact studies don’t support the church’s fears, though a preservation architect quoted by the Boston Globe says the concerns are warranted. The company plans $72 million in upgrades to the train station and surrounding area as part of a $1 billion project consisting of three office and apartment towers and a garage over the Massachusetts Turnpike.
The Boston Planning & Development Agency hasn’t made a decision on the church’s request, and has delayed a vote on the project while church officials and the developer continue discussions. In a related matter, the state passed a law earlier this year that allows more shade from buildings on Boston Common, a move that would allow construction of a proposed 700-foot tall tower above an old parking garage.
Related Stories
| Nov 14, 2013
Document on gypsum boards sets stage for preparing Environmental Product Declaration
The Gypsum Association has completed the development of a product category rules (PCR) document for North American gypsum boards.
| Nov 14, 2013
ISO, FLASH team up to promote stronger building codes
ISO has joined the national nonprofit Federal Alliance for Safe Homes (FLASH) to encourage communities to build disaster-resistant buildings that can withstand hurricanes, tornadoes, earthquakes, and other catastrophic events.
| Nov 6, 2013
Cost to small businesses from silica rule is raised by progressive group
The silica-dust rule from the Occupational Safety and Health Administration could put small businesses at a disadvantage on the cost of complying with the mandate, according to the Center for Progressive Reform.
| Nov 6, 2013
Uneven snow load concern prompts structural study of Minnesota college auditorium roof
The roof of the Memorial Auditorium of Concordia College in Minnesota will undergo a complete structural analysis because it was built to 1946 codes and may not be able to accommodate uneven snow loads.
| Nov 6, 2013
Dallas’s goal of carbon neutrality by 2030 advances with second phase of green codes
Dallas stands out as one of the few large cities that is enforcing a green building code, with the city aiming to be carbon neutral by 2030.
| Nov 6, 2013
Task force to examine resiliency in the face of climate change
President Barack Obama recently signed an executive order related to climate change and disaster-management efforts during severe weather events and other disasters.
| Nov 6, 2013
USGBC Northern California chapter focuses on improving indoor environments in green buildings
The Northern California branch of the U.S. Green Building Council is leading the “Building Health Initiative” that seeks to improve the indoor environment of green buildings.
| Oct 31, 2013
OSHA enacts 47-day extension for comment period on silica-exposure rule
The Occupational Safety and Health Administration has extended the public comment period on its silica-dust exposure rule by 47 days.
| Oct 31, 2013
Updates to California’s building codes take effect Jan. 1
Green-building and accessibility are the major themes of the 2013 updates to California’s construction codes that are set to take effect Jan. 1.
| Oct 31, 2013
IECC code updates include better lighting controls and new HVAC technology
The proposed new code will increase the mandatory installation of occupancy sensors and daylighting controls to many new types of spaces.