flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Boston’s Old South Church asks tower developer for $19 million for casting shade

Codes and Standards

Boston’s Old South Church asks tower developer for $19 million for casting shade

Request highlights ongoing conflict between developers and residents over right to sunshine.


By Peter Fabris, Contributing Editor | October 26, 2017

Boston’s Old South Church is the latest aggrieved party in a simmering battle for sunshine amid a downtown building boom.

The 142-year-old church is two blocks away from a planned tower at Back Bay Station, a subway and commuter rail stop. Representatives for the church are concerned that shadows from the planned 365-foot tall structure would cause moisture damage to masonry and darken stained-glass windows.

Old South Church has asked the developer for $19 million in mitigation funds, with $4 million going toward repairs to the church. The remaining $15 million would go to a citywide fund for affordable home-ownership programs.

Boston Properties, the developer, says the fee is exorbitant, and that impact studies don’t support the church’s fears, though a preservation architect quoted by the Boston Globe says the concerns are warranted. The company plans $72 million in upgrades to the train station and surrounding area as part of a $1 billion project consisting of three office and apartment towers and a garage over the Massachusetts Turnpike.

The Boston Planning & Development Agency hasn’t made a decision on the church’s request, and has delayed a vote on the project while church officials and the developer continue discussions. In a related matter, the state passed a law earlier this year that allows more shade from buildings on Boston Common, a move that would allow construction of a proposed 700-foot tall tower above an old parking garage.

Related Stories

Codes and Standards | May 8, 2018

Powerhouse coalition builds energy positive buildings

The goal: build buildings that provide more power than they cost to build, run, and demolish.

Codes and Standards | May 7, 2018

Plan advances in Los Angeles for Climate Emergency Mobilization Department

Would oversee efforts to reduce greenhouse gas emissions across the city.

Codes and Standards | May 3, 2018

Data collection, machine learning boost building efficiency

Sensors, software algorithms squeeze out waste.

Codes and Standards | May 1, 2018

ASHRAE publishes new energy simulation-aided design standard

Requires building energy modeling during schematic design.

Codes and Standards | Apr 30, 2018

CALGreen projects pre-approved for streamlined LEED v4 requirements

Reduces need to run additional energy models.

Codes and Standards | Apr 26, 2018

New standard supports community resilience

ASTM International guidance supports cost-effective ways to withstand and recover from disasters.

Codes and Standards | Apr 25, 2018

Lessons learned from decades of Superfund cleanups guide contaminated land reuse

Sites repurposed for residential, commercial use, and solar energy generation.

Codes and Standards | Apr 24, 2018

Vibrant downtown core the key for urban multifamily development

Nighttime activity makes the difference.

Codes and Standards | Apr 19, 2018

ILFI launches new Zero Carbon Certification

Offers greater flexibility around project fuel types and offsetting renewables.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021