flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Boston’s new flood protection plan centers on new parks

Codes and Standards

Boston’s new flood protection plan centers on new parks

Initiative would add 67 acres of public open space.


By Peter Fabris, Contributing Editor | October 31, 2018

Boston Mayor Martin Walsh recently unveiled a flood protection plan that keys on new parks and upgrades of existing ones.

City leaders were alarmed when storms last winter put parts of the downtown area and the Seaport district underwater for a more than a day. Recent sea level rise forecasts have added urgency to the issue.

The plan would add 67 acres of public open space in areas that could act as flood buffers, and some existing parks would be renovated to boost their elevation. Some low-lying streets would also be raised, and sea walls would be added along privately owned sections of the Harborwalk, a coastal pedestrian path. 

Business leaders expressed support for the plan, but some experts questioned how the money would be raised for the ambitious proposal. Boston already urges developers to plan for sea level rise in new waterfront buildings, but does not mandate that they do so. In the future, those provisions might become requirements, and landowners might have to help pay for the extensive work proposed by the mayor.

Related Stories

| Sep 1, 2011

Project Aims to Automate Code Compliance Assessment

FIATECH, a consortium of owners from the industrial, power, and retail markets that build large structures, launched a project this year to validate the use of automation technology for code compliance assessment, and to accelerate the regulatory approval process using building models. Long-term objectives include the development of an extensive, open-source rule set library that is approved by industry and regulatory bodies for use by technology developers and code officials.

| Sep 1, 2011

EPA Says Additional Lead Paint Cleaning Rules Not Necessary

The EPA has concluded that current Lead: Renovation, Repair, and Painting Program (LRRP) cleaning requirements and lead-safe work regulations are sufficient to protect the public from lead dust hazards. “Our members have been instrumental in contacting legislators to detail the detrimental impact of the current LRRP," says Richard Walker, American Architectural Manufacturers Association’s president and CEO. “This collective industry voice has prompted the EPA to make the responsible decision to refrain from adding further, unnecessary costs to homeowners under the current economic climate."http://www.aamanet.org/news/1/10/0/all/603/aama-commends-its-members-congress-for-vacating-lrrp-clearance-rule

| Aug 11, 2010

Best AEC Firms of 2011/12

Later this year, we will launch Best AEC Firms 2012. We’re looking for firms that create truly positive workplaces for their AEC professionals and support staff. Keep an eye on this page for entry information. +

boombox1
boombox2
native1

More In Category


Resiliency

U.S. is reducing floodplain development in most areas

The perception that the U.S. has not been able to curb development in flood-prone areas is mostly inaccurate, according to new research from climate adaptation experts. A national survey of floodplain development between 2001 and 2019 found that fewer structures were built in floodplains than might be expected if cities were building at random.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021