Boston has enacted new rules to help buildings withstand climate change.
The Boston Planning & Development Agency approved the new rules recently with the aims of helping to minimize flooding, keep the lights on in more buildings during power outages, and make it easier to upgrade street lights and other public works. Developments of 1.5 million sf or larger will need to assess installing an on-site power plant, and would have to build one if it’s financially feasible.
The largest developments will also have to consolidate all wiring for cable, Internet, and other telecom services into one underground tube to minimize disruption to streets and sidewalks during repairs. Any new development greater than 100,000 sf will have to retain more rainfall than currently required to help prevent runoff during storms from contributing to floods.
Developers of projects greater than 50,000 sf would need to install extra wiring and technology for smart traffic signals and street lights if the projects require new or improved signals or lights. The rules will undergo a two-year testing period.
Related Stories
Codes and Standards | May 5, 2020
2020 IECC will lead to significant carbon emissions reductions
New model building code nearly finalized.
Codes and Standards | May 4, 2020
New York expands prevailing wage law
Now includes private projects with 30% or more of public subsidies.
Codes and Standards | May 1, 2020
OSHA says most employers don’t have to track worker COVID-19 infections
Agency clarifies responsibility for contractors, others.
Codes and Standards | Apr 29, 2020
New York City tightens restrictions on construction during pandemic
Dept. of Buildings has issued more than 100 violations and stop-work orders.
Codes and Standards | Apr 28, 2020
ASHRAE, WELL panels to tackle revising standards to limit spread of viruses in buildings
Will examine ways to reduce infectious threats through building designs and operations.
Codes and Standards | Apr 24, 2020
Dept. of Labor issues guidance for respiratory protection during N95 shortage
Elastomeric respirators or powered, air-purifying respirators, and expired N95s are allowable alternatives
Codes and Standards | Apr 23, 2020
Group will create ecosystem for smart building data
Seven Finnish companies aim to integrate all technical systems into a single platform.
Codes and Standards | Apr 23, 2020
COVID-19 epidemic demonstrates value of flexible hospital space
Some rooms being repurposed for ICU care.
Codes and Standards | Apr 15, 2020
Embodied carbon footprint can be reduced by using conventional materials
High-SCM concrete, and cellulose and wood fiber insulation among the greener alternatives.
Coronavirus | Apr 13, 2020
COVID-19 alert: City conducts a 'virtual building inspection' to allow Starbucks and bank to open
Bothell, Wash., issues a certificate of occupancy to developer after inspecting the property online.