Iain Jackson, an architect and lecturer at the Liverpool School of Architecture, has seen his new architecture students make the same pattern of mistakes.
He’s here to help. Jackson wrote “The Architecture School Survival Guide,” a 156-page book filled with applicable tips and hints—and drawings.
ArchDaily ran an excerpt of the book’s fifth chapter, titled “Process.” In it, Jackson suggests that students should be bold, saying, “Be prepared to design what others think of as ghastly. Don’t automatically reject the popular, pastiche or commonplace. Modernism and minimalism do not always equal good.”
In the chapter, Jackson also examines the facets of architecture that could be overlooked, from big (like building pedestals) to small (doorways, for example).
From Laurence King Publishing, the book sells for $16.95.
Related Stories
| May 29, 2012
Torrance Memorial Medical Center’s pediatric burn patients create their version of new Patient Tower using Legos
McCarthy workers joined the patients, donning construction gear and hard hats, to help with their building efforts.
| May 29, 2012
Reconstruction Awards Entry Information
Download a PDF of the Entry Information at the bottom of this page.
| May 29, 2012
AIA expands Documents-On-Demand service??
Six new documents added, DOD offers nearly 100 contract documents.
| May 29, 2012
Legrand achieves over 20% energy-intensity reduction in Presidential Challenge
West Hartford headquarters announced as Better Buildings, Better Plants “Showcase” site.
| May 29, 2012
Thornton Tomasetti/Fore Solutions provides consulting for Phase I of Acadia Gateway Center
Project receives LEED Gold certification.
| May 24, 2012
2012 Reconstruction Awards Entry Form
Download a PDF of the Entry Form at the bottom of this page.
| May 24, 2012
Gilbane’s Spring 2012 economic report identifies multiple positive economic and market factors
Anticipating increasing escalation in owner costs through 2014.
| May 24, 2012
Construction backlog declines 5.4% in the first quarter of 2012?
The nation’s nonresidential construction activity will remain soft during the summer months, with flat to declining nonresidential construction spending.
| May 24, 2012
Stellar completes St. Mark’s Episcopal Church and Day School renovation and expansion
The project united the school campus and church campus including a 1,200-sf chapel expansion, a new 10,000-sf commons building, 7,400-sf of new covered walkways, and a drop-off pavilion.