flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

BOKA Powell-designed facility at Texas A&M Bryan campus

BOKA Powell-designed facility at Texas A&M Bryan campus

The new facility provides programs for the Texas A&M Health Science Center, the Texas Brain and Spine Institute, Mary Crowley Cancer Research Centers, and Blinn College Allied Health programs.


By By BD+C Staff | January 19, 2012
The $26 million facility is a Class A office, clinical and education space integrating ancillary medical services with physician

Skanska USA Building and BOKA Powell LLC announced the completion of a 130,000-square-foot, clinical building on the Texas A&M Health Science Center Bryan campus. The $26 million facility is a Class A office, clinical and education space integrating ancillary medical services with physician practices, allied health college programs, and the Texas A&M Health Science Center College of Medicine. The building design encourages strong collaboration among students, medical professionals, and support personnel.

The new facility provides programs for the Texas A&M Health Science Center, the Texas Brain and Spine Institute, Mary Crowley Cancer Research Centers, and Blinn College Allied Health programs. Blinn College created a new platform for teaching its allied health programs--a state-of-the-art simulated hospital that includes emergency medical services, nursing, physical therapy, radiology, surgical technology, and respiratory therapy.

Designed with two distinct lobbies, private entrances and elevators, the center provides a separation between the clinicians, patients, and students.  The design will help Blinn College double its enrollment of nurses in the next five years.

Rose Rock Capital, in partnership with U.S. HealthRealty, was the developer and provided financing for the project.  BOKA Powell LLC was the programmer, designer and architect of record.  Skanska USA Building provided construction manager services for the project. BD+C

Related Stories

| Jul 23, 2012

Missner Group completes construction of Chicago auto dealership

The Missner Group also incorporated numerous sustainable improvements to the property including the implementation of a vegetative roof, and the utilization of permeable pavers for the parking lot.

| Jul 20, 2012

2012 Giants 300 Special Report

Ranking the leading firms in Architecture, Engineering, and Construction.

| Jul 20, 2012

Data Centers Report: Demand ‘exploding’

BD+C's Giants 300 Top 25 AEC Firms in the Data Center sector.

| Jul 20, 2012

Office Report: Fitouts, renovations keep sector moving

BD+C's Giants 300 Top 25 AEC Firms in the Office sector.

| Jul 20, 2012

K-12 Schools Report: ‘A lot of pent-up need,’ with optimism for ’13

The Giants 300 Top 25 AEC Firms in the K-12 Schools Sector.

| Jul 20, 2012

Higher education market holding steady

But Giants 300 University AEC Firms aren’t expecting a flood of new work.

| Jul 20, 2012

3 important trends in hospital design that Healthcare Giants are watching closely

BD+C’s Giants 300 reveals top AEC firms in the healthcare sector.

| Jul 20, 2012

Global boom for hotels; for retail, not so much

The Giants 300 Top 10 Firms in the Hospitality and Retail sectors.

| Jul 20, 2012

Firms bracing for DoD cuts

The Giants 300 Top 25 AEC Firms in the Military sector.

| Jul 20, 2012

Gensler, Stantec, Turner lead ‘green’ firms

The Top 10 AEC Firms in Green Buildings and LEED Accredited Staff.

boombox1
boombox2
native1

More In Category

Warehouses

California bill would limit where distribution centers can be built

A bill that passed the California legislature would limit where distribution centers can be located and impose other rules aimed at reducing air pollution and traffic. Assembly Bill 98 would tighten building standards for new warehouses and ban heavy diesel truck traffic next to sensitive sites including homes, schools, parks and nursing homes.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021