flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Boards at odds over North Carolina county’s CM-at-Risk policy

Boards at odds over North Carolina county’s CM-at-Risk policy

Wake County school officials favor CM-at-Risk, while commissioners are wary


August 14, 2014

The Wake County, North Carolina School Board is happy with its use of construction manager at risk for its construction projects, citing the ability to better keep projects on schedule. Some local small contractors are not pleased, though, with the board’s CM-at-Risk policy that was instituted in 2007. The county’s board of commissioners has offered a sympathetic ear to their complaints.

The key point of dispute is that under this delivery method, the construction manager prequalifies the subcontractors who can bid on the work. Some feel that as a result of this provision they are shut out of the process for work that was previously open to them.

These complaints helped lead to the passage of a state law last year requiring public entities to justify using CM-at-Risk for each project. Under this law, school staff will come back to the school board to request approval for using CM-at-Risk for most of the major projects funded by last fall’s bond issue.

At odds over this issue, the two boards have yet to reach consensus on how CM-at-Risk should be used on future school projects.

(http://www.newsobserver.com/2014/08/11/4059339/wake-county-schools-defend-use.html)

             

Related Stories

Codes and Standards | Apr 28, 2021

Building-integrated solar power turns buildings into power plants

Multiple alternatives could replace or complement rack-mounted PV arrays.

Codes and Standards | Apr 27, 2021

Ten real estate groups sign on to New York State’s high-rise decarbonization challenge

Each signee commits to carbon neutrality in one or more high-rise buildings it owns.

Codes and Standards | Apr 26, 2021

Dozens of companies, organizations call for Congress to double Energy Star funding

Despite broad support, program’s budget has steadily declined in recent years.

Codes and Standards | Apr 22, 2021

Alabama fire chiefs oppose proposal to change school building code oversight

Bill would move code compliance control from state to local boards.

Codes and Standards | Apr 21, 2021

After dry winter, California ramps up wildfire prevention efforts

State to spend half a billion dollars on projects including making buildings more fire resistant.

Codes and Standards | Apr 20, 2021

U.S. electric grid is halfway to zero carbon

Other sectors including buildings lag power industry.

Codes and Standards | Apr 19, 2021

Failed landmark preservation effort in Chicago provides lessons for planners

Gentrification fears heightened among Pilsen neighborhood residents doomed ambitious preservation plan.

Codes and Standards | Apr 14, 2021

New Phase 1 Environmental Site Assessment standard debuts in 2021

Will affect 250,000 commercial real estate deals a year.

Codes and Standards | Apr 13, 2021

British Columbia moves to accelerate mass timber construction

Province funds demonstration projects as part of economic recovery.

Codes and Standards | Apr 12, 2021

WoodWorks and Think Wood release first Mass Timber Design Manual

Interactive collection of information on mass timber products, design best practices, taller wood construction and sustainability.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021