flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

BLT Architects Selected to Complete New Project for Drexel University

BLT Architects Selected to Complete New Project for Drexel University

The Dornsife Center for Neighborhood Partnerships is expected to open in 2014


By Posted by Raissa Rocha, Associate Editor | January 18, 2013

BLT Architects (BLTa), a Philadelphia-based architectural and interior design firm, announced it has been commissioned to begin work on Drexel University's Dornsife Center. The Dornsife Center was made possible by a generous $10 million gift by Dana and David Dornsife and will be located on a 1.3-acre site at 35th and Spring Garden streets.

The Dornsife Center will be a resource hub to share expertise and knowledge with the West Philadelphia community. The center will offer a welcoming environment for local children, senior citizens, and families to interact with technology. The current site of the Dornsife Center is home to three existing buildings — an elementary school and two administrative buildings that have sat dormant for a number of years. These buildings will be renovated by BLTa to provide a range of flexible spaces that will accommodate small group meetings and workshops, as well as larger gatherings and hands-on exhibits.

“We are excited to begin renovations on Drexel's newest outreach efforts in West Philadelphia," said Michael L. Prifti, FAIA, Managing Principal at BLTa. "This project is especially fulfilling as not only will we be restoring life to a site that has sat vacant for years, but the newly outfitted buildings will serve a higher purpose of providing a harbor of learning for the local community. BLTa has a deep history of renovating existing structures and new construction in higher education settings, and we are looking forward to bringing our expertise to the Dornsife project." +

Related Stories

| Mar 6, 2012

EwingCole completes first design-build project for the USMA

The second phase of the project, which includes the academic buildings and the lacrosse and football fields, was completed in January 2012.

| Mar 6, 2012

Joliet Junior College achieves LEED Gold

With construction managed by Gilbane Building Company, Joliet Junior College’s Facility Services Building combines high-performance technologies with sustainable materials to meet aggressive energy efficiency goals.

| Mar 1, 2012

Cornell shortlists six architectural firms for first building on tech campus

Each of the firms will be asked to assemble a team of consultants and prepare for an interview to discuss their team’s capabilities to successfully design the university’s project.

| Mar 1, 2012

Bomel completes design-build parking complex at U.C. San Diego

The $24-million facility, which fits into a canyon setting on the university’s East Campus, includes 1,200 stalls in two adjoining garages and a soccer field on a top level. 

| Feb 28, 2012

Salem State University Library & Learning Commons topped off

When it opens to students in the fall of 2013, the $60 million facility will offer new archival space; circulation and reference areas; collections; reading spaces; study rooms; instruction labs and a Dean’s suite. 

| Feb 28, 2012

Griffin Electric completes Medical University of South Carolina project

The 210,000-sf complex is comprised of two buildings, and houses research, teaching and office areas, plus conference spaces for the University.

| Feb 14, 2012

Angelo State University opens doors to new recreation center expansion

  Designed by SmithGroup, the JJR_Center for Human Performance offers enhanced fitness options, dynamic gathering space.

| Feb 6, 2012

Siemens gifts Worcester Polytechnic Institute $100,000 for fire protection lab renovation

Siemens support is earmarked for the school’s Fire Protection Engineering Lab, a facility that has been forwarding engineering and other advanced degrees, graduating fire protection engineers since 1979.

| Feb 2, 2012

Fire rated glazing helps historic university preserve its past

When the University embarked on its first major addition since the opening of Hutchins Hall in 1933, preserving the Collegiate Gothic-style architecture was of utmost importance.

| Feb 2, 2012

Next phase of construction begins on Scripps Prebys Cardiovascular Institute

$456 million Institute will be comprehensive heart center for 21st Century.

boombox1
boombox2
native1

More In Category




Student Housing

The University of Michigan addresses a decades-long student housing shortage with a new housing-dining facility

The University of Michigan has faced a decades-long shortage of on-campus student housing. In a couple of years, the situation should significantly improve with the addition of a new residential community on Central Campus in Ann Arbor, Mich. The University of Michigan has engaged American Campus Communities in a public-private partnership to lead the development of the environmentally sustainable living-learning student community.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021