flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

BLT Architects Selected to Complete New Project for Drexel University

BLT Architects Selected to Complete New Project for Drexel University

The Dornsife Center for Neighborhood Partnerships is expected to open in 2014


By Posted by Raissa Rocha, Associate Editor | January 18, 2013

BLT Architects (BLTa), a Philadelphia-based architectural and interior design firm, announced it has been commissioned to begin work on Drexel University's Dornsife Center. The Dornsife Center was made possible by a generous $10 million gift by Dana and David Dornsife and will be located on a 1.3-acre site at 35th and Spring Garden streets.

The Dornsife Center will be a resource hub to share expertise and knowledge with the West Philadelphia community. The center will offer a welcoming environment for local children, senior citizens, and families to interact with technology. The current site of the Dornsife Center is home to three existing buildings — an elementary school and two administrative buildings that have sat dormant for a number of years. These buildings will be renovated by BLTa to provide a range of flexible spaces that will accommodate small group meetings and workshops, as well as larger gatherings and hands-on exhibits.

“We are excited to begin renovations on Drexel's newest outreach efforts in West Philadelphia," said Michael L. Prifti, FAIA, Managing Principal at BLTa. "This project is especially fulfilling as not only will we be restoring life to a site that has sat vacant for years, but the newly outfitted buildings will serve a higher purpose of providing a harbor of learning for the local community. BLTa has a deep history of renovating existing structures and new construction in higher education settings, and we are looking forward to bringing our expertise to the Dornsife project." +

Related Stories

Game Changers | Jan 12, 2018

‘Kit of parts’ anchors university’s remake

Sasaki designs interchangeable spaces to support a major educational shift at Mexico’s largest university system.

Education Facilities | Jan 8, 2018

Three former school buildings are repurposed to create mini-campus for teacher education

The $25.3 million project is currently under construction on the Winona State University campus.

Healthcare Facilities | Jan 6, 2018

A new precision dental center embodies Columbia University’s latest direction for oral medicine education

The facility, which nests at “the core” of the university’s Medical Center, relies heavily on technology and big data. 

Big Data | Jan 5, 2018

In the age of data-driven design, has POE’s time finally come?

At a time when research- and data-based methods are playing a larger role in architecture, there remains a surprisingly scant amount of post-occupancy research. But that’s starting to change.

Mixed-Use | Jan 5, 2018

USC Village is the largest development in the history of the University of Southern California

USC Village comprises six buildings and 1.25 million sf.

Adaptive Reuse | Jan 4, 2018

Student housing development on Chapman University campus includes adaptive reuse of 1918 packing house

The Packing House was originally built for the Santiago Orange Growers Association.

University Buildings | Dec 20, 2017

New residence hall to house 500 students at Duke University

The project was designed by William Rawn Architects and will be built by Skanska.

University Buildings | Dec 4, 2017

The University of Nebraska’s new College of Business building highlights entrepreneur alumni and corporate leaders

Numerous storytelling spaces and displays are located throughout the building.

Wood | Nov 30, 2017

The first large-scale mass timber residence hall in the U.S. is under construction at the University of Arkansas

Leers Weinzapfel Associates, Modus Studio, Mackey Mitchell Architects, and OLIN collaborated on the design.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021