flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

BLT Architects Selected to Complete New Project for Drexel University

BLT Architects Selected to Complete New Project for Drexel University

The Dornsife Center for Neighborhood Partnerships is expected to open in 2014


By Posted by Raissa Rocha, Associate Editor | January 18, 2013

BLT Architects (BLTa), a Philadelphia-based architectural and interior design firm, announced it has been commissioned to begin work on Drexel University's Dornsife Center. The Dornsife Center was made possible by a generous $10 million gift by Dana and David Dornsife and will be located on a 1.3-acre site at 35th and Spring Garden streets.

The Dornsife Center will be a resource hub to share expertise and knowledge with the West Philadelphia community. The center will offer a welcoming environment for local children, senior citizens, and families to interact with technology. The current site of the Dornsife Center is home to three existing buildings — an elementary school and two administrative buildings that have sat dormant for a number of years. These buildings will be renovated by BLTa to provide a range of flexible spaces that will accommodate small group meetings and workshops, as well as larger gatherings and hands-on exhibits.

“We are excited to begin renovations on Drexel's newest outreach efforts in West Philadelphia," said Michael L. Prifti, FAIA, Managing Principal at BLTa. "This project is especially fulfilling as not only will we be restoring life to a site that has sat vacant for years, but the newly outfitted buildings will serve a higher purpose of providing a harbor of learning for the local community. BLTa has a deep history of renovating existing structures and new construction in higher education settings, and we are looking forward to bringing our expertise to the Dornsife project." +

Related Stories

University Buildings | Mar 17, 2021

UIC’s Computer Design Center will help meet the demands of a growing student body

LMN Architects in collaboration with Booth Hansen is designing the project.

University Buildings | Feb 26, 2021

Dartmouth College’s new faculty and graduate student center completes

Leers Weinzapfel Associates designed the project.

Market Data | Feb 24, 2021

2021 won’t be a growth year for construction spending, says latest JLL forecast

Predicts second-half improvement toward normalization next year.

Multifamily Housing | Jan 8, 2021

Student housing development in the time of COVID-19

Despite the coronavirus pandemic, many college and university residences were completed in time for classes, live or virtual. Here are 14 of the best.

Giants 400 | Dec 16, 2020

Download a PDF of all 2020 Giants 400 Rankings

This 70-page PDF features AEC firm rankings across 51 building sectors, disciplines, and specialty services.

University Buildings | Dec 13, 2020

U. of Oregon’s new Knight Campus is set up to turn ideas into reality

Its design encourages occupant productivity and well-being.

Giants 400 | Dec 3, 2020

2020 Science & Technology Facilities Giants: Top architecture, engineering, and construction firms in the S+T sector

HDR, Jacobs, and Turner head BD+C's rankings of the nation's largest science and technology (S+T) facilities sector architecture, engineering, and construction firms, as reported in the 2020 Giants 400 Report.

boombox1
boombox2
native1

More In Category




Student Housing

The University of Michigan addresses a decades-long student housing shortage with a new housing-dining facility

The University of Michigan has faced a decades-long shortage of on-campus student housing. In a couple of years, the situation should significantly improve with the addition of a new residential community on Central Campus in Ann Arbor, Mich. The University of Michigan has engaged American Campus Communities in a public-private partnership to lead the development of the environmentally sustainable living-learning student community.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021