flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Blast testing of loaded mass timber structures yields positive results

Codes and Standards

Blast testing of loaded mass timber structures yields positive results

Four tests covered a spectrum of blast loads.


By Peter Fabris, Contributing Editor | May 15, 2018

Blast tests on three existing two-story, single-bay cross-laminated timber (CLT) structures at Tyndall Air Force Base were successful, according to WoodWorks, a program working with the Wood Products Council.

“On-site observations were decidedly positive; all structures remained intact under significant explosive loading well beyond their design capacity,” according to a council news release. This was the second phase of blast testing on CLT structures conducted by WoodWorks.

“Last year, we tested the structures under their own self-weight,” said Bill Parsons, vice president of operations for WoodWorks. “Those tests were successful and, this year, we built on that effort by testing whether the design methods established as a result of those initial tests needed to be adjusted when the buildings carried typical gravity loads and included different connection configurations, increased panel thickness, and alternate mass timber wall systems.”

One building used 5-ply CLT front wall panels, the second used off-the-shelf prefabricated angle brackets, and the third included nail-laminated timber (NLT) front panels. All three structures remained standing following the fourth and largest blast, intended to take the structures well beyond their design intent. While panel rupture was observed on all front and side wall panels, the buildings maintained enough residual capacity to remain intact and safe to enter, the release says.

Related Stories

| May 8, 2014

Door knob code revisions generating controversy

The City of Vancouver’s ban on doorknobs in all new buildings, which went into effect last month, has drawn a strong reaction from the public and heated debate across Canada as other jurisdictions consider the measure.

| May 8, 2014

Structural concrete code revisions open for public comments

The American Concrete Institute’s completely reorganized ACI 318-14, “Building Code Requirements for Structural Concrete and Commentary,” is open for public review for a 45-day period.

| May 3, 2014

Controversy rages over cost, benefits of proposed OSHA silica dust rule

Introduced in August 2013, the proposal would lower allowable levels of crystalline silica in all workplaces, standardize how the dust is calculated, and require medical monitoring for employees exposed to high levels.

| May 3, 2014

California’s Title 24 promises to reshape the construction industry

California’s recent revisions to Title 24 contain ambitious performance goals: all residential buildings must be Zero Net Energy by 2020 and commercial buildings must reach that standard by 2030.

| Apr 30, 2014

House Appropriations Committee approves $3 billion cut for military construction

The Army would see the sharpest cuts on a percentage basis, with a $578 million, or 52% reduction in FY 2015.

| Apr 30, 2014

GSA wants to trade D.C. office building for construction and development services

The GSA has issued an RFQ seeking developers who can provide construction and development services in exchange for the GSA Regional Office Building and Cotton Annex located in Southwest Washington, D.C.

| Apr 30, 2014

Mexico City spending big on green roofs to fight air pollution

Although green roofs have been widely adopted in urban areas to reduce the heat island effect and stormwater runoff, Mexico City is hoping that vegetative rooftops can also reduce the city’s air pollution.

| Apr 23, 2014

California bill would make employers responsible for subcontractors' wages, workers' comp

Under the recently revised Assembly Bill 1897, employers would have to pay wages, taxes, and workers compensation on behalf of a subcontractor’s workers if the subcontractor reneges on that responsibility.

| Apr 23, 2014

Obama’s 2015 budget includes $1.7 billion to GSA for building construction, renovations

The Obama Administration has proposed $1.7 billion for construction, renovation, and repairs to federal buildings in fiscal year 2015 under the auspices of the U.S. General Services Administration.

| Apr 18, 2014

Massachusetts Supreme Court clarifies building code liability issue on mixed-use projects

The Massachusetts Supreme Judicial Court recently ruled that distinct portions of a mixed-used building may be treated as distinct and different structures under the state building code.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021