flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Blast testing of loaded mass timber structures yields positive results

Codes and Standards

Blast testing of loaded mass timber structures yields positive results

Four tests covered a spectrum of blast loads.


By Peter Fabris, Contributing Editor | May 15, 2018

Blast tests on three existing two-story, single-bay cross-laminated timber (CLT) structures at Tyndall Air Force Base were successful, according to WoodWorks, a program working with the Wood Products Council.

“On-site observations were decidedly positive; all structures remained intact under significant explosive loading well beyond their design capacity,” according to a council news release. This was the second phase of blast testing on CLT structures conducted by WoodWorks.

“Last year, we tested the structures under their own self-weight,” said Bill Parsons, vice president of operations for WoodWorks. “Those tests were successful and, this year, we built on that effort by testing whether the design methods established as a result of those initial tests needed to be adjusted when the buildings carried typical gravity loads and included different connection configurations, increased panel thickness, and alternate mass timber wall systems.”

One building used 5-ply CLT front wall panels, the second used off-the-shelf prefabricated angle brackets, and the third included nail-laminated timber (NLT) front panels. All three structures remained standing following the fourth and largest blast, intended to take the structures well beyond their design intent. While panel rupture was observed on all front and side wall panels, the buildings maintained enough residual capacity to remain intact and safe to enter, the release says.

Related Stories

Codes and Standards | Jul 26, 2017

New ISO standard on video fire detectors will help identify fires more quickly

The standard marks the first comprehensive international specification for this equipment.

Codes and Standards | Jul 25, 2017

Geotechnical solutions prevent building distress due to expansive clay soils

The condition is the most common geologic hazard in the U.S.

Codes and Standards | Jul 24, 2017

Non-union labor gaining ground in New York City

President of contractors’ group says competitive pricing is spurring more open shops.

Codes and Standards | Jul 20, 2017

New tallest tower west of the Mississippi built to stringent seismic standards

L.A.’s new 1,100-foot skyscraper dominates city’s skyline.

Codes and Standards | Jul 19, 2017

Economic impacts of climate change will jump over next two decades

Average annual cost to buildings and infrastructure from eastern storms to rise by $7.3 billion.

Codes and Standards | Jul 18, 2017

Energy modeling yields accuracy within 4%, says new study

Results of the study support the usefulness of the practice.

Codes and Standards | Jul 13, 2017

Net Zero Energy rebranded as ‘Zero Energy’

ILF aims to make new certification the sole standard for highest performing buildings.

Codes and Standards | Jul 13, 2017

New York City creates $10 million fund to help women- and minority-owned firms win construction contracts

The money is earmarked for up to $500,000 surety bonds per contract.

Codes and Standards | Jul 12, 2017

New International Building Code allows weather-resistive barriers above 40 feet

Danger of propagating flames now deemed negligible.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021