flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Blast testing of loaded mass timber structures yields positive results

Codes and Standards

Blast testing of loaded mass timber structures yields positive results

Four tests covered a spectrum of blast loads.


By Peter Fabris, Contributing Editor | May 15, 2018

Blast tests on three existing two-story, single-bay cross-laminated timber (CLT) structures at Tyndall Air Force Base were successful, according to WoodWorks, a program working with the Wood Products Council.

“On-site observations were decidedly positive; all structures remained intact under significant explosive loading well beyond their design capacity,” according to a council news release. This was the second phase of blast testing on CLT structures conducted by WoodWorks.

“Last year, we tested the structures under their own self-weight,” said Bill Parsons, vice president of operations for WoodWorks. “Those tests were successful and, this year, we built on that effort by testing whether the design methods established as a result of those initial tests needed to be adjusted when the buildings carried typical gravity loads and included different connection configurations, increased panel thickness, and alternate mass timber wall systems.”

One building used 5-ply CLT front wall panels, the second used off-the-shelf prefabricated angle brackets, and the third included nail-laminated timber (NLT) front panels. All three structures remained standing following the fourth and largest blast, intended to take the structures well beyond their design intent. While panel rupture was observed on all front and side wall panels, the buildings maintained enough residual capacity to remain intact and safe to enter, the release says.

Related Stories

Codes and Standards | Jan 31, 2018

California is the first state to phase out incandescent light bulbs

In two years, the rest of the U.S. will follow suit.

Codes and Standards | Jan 31, 2018

Automated tool assists in design of force transfer around openings

Engineered Wood Assn. offers free calculator and technical note.

Codes and Standards | Jan 31, 2018

First large-scale use of perovskite solar cells in office building slated for Poland this year

Skanska will integrate the technology into building facades.

Codes and Standards | Jan 29, 2018

Advanced Energy Design Guide for K-12 Schools to achieve zero energy

Publication is joint effort by ASHRAE, AIA, IES, and USGBC.

Codes and Standards | Jan 26, 2018

Flying drones while inebriated now illegal in New Jersey

Violators could be sentenced to six months in jail.

Codes and Standards | Jan 25, 2018

OSHA penalties for violations increase

Fines adjusted for inflation in the New Year.

Codes and Standards | Jan 23, 2018

Disaster mitigation strategies that exceed code could save billions

Four dollars saved for every dollar spent, says NIBS report.

Codes and Standards | Jan 19, 2018

U.S. construction fatalities rose 6% in 2016

Falls accounted for 39% of deadly accidents.

Codes and Standards | Jan 18, 2018

Record storm surge in Boston prompts renewed calls for flood mitigation infrastructure

Newer buildings constructed in flood zone fared well.

Codes and Standards | Jan 17, 2018

Green Building Initiative acquires global rights to Green Globes from JLL

Transaction allows GBI to expand operations to Canada and elsewhere.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021