flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Blackney Hayes designs school for students with learning differences

Blackney Hayes designs school for students with learning differences

The 63,500 sf building allows AIM to consolidate its previous two locations under one roof, with room to expand in the future. 


By By BD+C Staff | February 1, 2012
The interior design includes carpet with 65% recycled content, light fixtures re
The interior design includes carpet with 65% recycled content, light fixtures reused from the existing building, and natural lig

Blackney Hayes Architects announced that their project, AIM Academy in Manayunk, has opened. A school for bright children in grades 1-12 with learning differences, AIM Academy in Manayunk is located in Conshohocken, Pa.

Originally an 18th century paper mill, the buildings were converted to office space by Blackney Hayes in 1999. When AIM considered relocating from its Manayunk location, Blackney Hayes was able to recommend the space, which had been vacated in 2010. The firm’s familiarity with the building systems streamlined further conversion to a school. Opened on Jan. 3, the 63,500 sf building allows AIM to consolidate its previous two locations under one roof, with room to expand in the future. 

The facility contains nontraditional classrooms for collaborative learning, an arts and music wing, cafeteria, and state-of-the-art global resource center with state of the art technology. The interior design includes carpet with 65% recycled content, light fixtures reused from the existing building, and natural light in most of the occupied spaces. Walls and floors are covered with bright, warm shades of green, yellow and orange. Some of the furniture was repurposed, with a portion coming from a pharmaceutical company that had recently closed and some from the existing school. The AIM Institute for Learning and Research is housed in the separate professional development wing of the building with multiple hi-tech training rooms. A soccer field and gymnasium / performing arts center are planned for Phase 2. BD+C

Related Stories

| Oct 3, 2012

Fifth public comment period now open for update to USGBC's LEED Green Building Program

LEED v4 drafts and the public comment tool are now available on the newly re-launched, re-envisioned USGBC.org website.

| Oct 2, 2012

Mirvish and Gehry unveil conceptual design to transform Toronto’s entertainment district

Reimagining of King Street Entertainment District supports Toronto’s cultural corridor.

| Oct 2, 2012

Dow Business Services Center building named 2012 “America’s Best Buildings of the Year” winner

Building constructed with air sealing and insulation products from Dow Building Solutions.

| Oct 2, 2012

Bernards working on project at L.A. White Memorial Medical Center

The new facility is a $15-million, 41,000-sf concrete structure which includes three stories of medical office space atop a three-level parking garage.

| Oct 1, 2012

Tyco completes separation process, now largest pure-play fire protection and security business

Tyco Integrated Security focused on delivering security solutions to commercial businesses.

| Sep 28, 2012

Seattle is home to first LEED-certified modular radiation center

By using modular construction and strategic site design, RAD Medical Systems built the first radiation center to receive LEED certification.

| Sep 26, 2012

EDITORIAL OPPORTUNITY – BD+C Greenbuild 2012 Issue

Your firm is invited to contribute to this special issue, which will be distributed at Greenbuild San Francisco, Nov. 14-16, 2012.

| Sep 24, 2012

Reed Construction completes Lafarge headquarters in Chicago

Reed Construction was contracted to complete the full third floor build-out which included the construction of new open area work space, private offices, four conference rooms with videoconferencing capabilities and an executive conference boardroom.

| Sep 24, 2012

Chicago Lakeside shortlisted for the Sustainia Award

The “Lakeside Idea” is about bridging a brownfield industrial past to a green lifestyle future, from steel mill to innovation mill.

| Sep 24, 2012

$3.8-million athletic field and track opens in Glen Head, N.Y.

The complex also includes a new, one-story, multi-purpose building that serves as the main entry port to the athletic facilities.

boombox1
boombox2
native1

More In Category



Urban Planning

The magic of L.A.’s Melrose Mile

Great streets are generally not initially curated or willed into being. Rather, they emerge organically from unintentional synergies of commercial, business, cultural and economic drivers. L.A.’s Melrose Avenue is a prime example. 


Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021