flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Bjarke Ingels Group’s new Shenzhen tower includes a folded building envelope

High-rise Construction

Bjarke Ingels Group’s new Shenzhen tower includes a folded building envelope

The new skyscraper is the home of Shenzhen Energy Company.


By David Malone, Associate Editor | August 8, 2018

Photo: Chao Zhang

Pleats may be out when it comes to pants, but Bjarke Ingels Group seems to think they look pretty good on skyscrapers.

The design firm’s new 96,000-sm office development for the Shenzhen Energy Company in Shenzhen, China uses an undulating building envelope that creates a rippled skin around the development’s two connected buildings. Folding parts of the envelope reduces solar loads and flare and creates a façade with closed and open parts that oscillate between transparency and opacity.

 

Shenzhen Energy Company headquartersPhoto: Chao Zhang.

 

The façade’s shape corresponds to the solar orientation, maximizing north-facing openings for natural light and views and minimizing exposure on the sunny sides. The façade is stretched out within the protruded areas of the buildings and two smooth deformations create large spaces for meeting rooms, executive clubs, and staff facilities. The façade system manages to reduce overall energy consumption of the building without any moving parts or complex technology.

 

See Also: WeWork names BIG’s Ingels as its Chief Architect

 

The development consists of two towers, a north tower that rises 220 meters and a south tower that rises 120 meters, that are linked together via a 34 meter podium. The podium contains main lobbies, a conference center, a cafeteria, and exhibition space.

 

Exterior facade of Shenzhen Energy HeadquartersPhoto: Chao Zhang.

 

Visitors will enter from the north and south ends of the buildings while employees will enter from the front plaza into the naturally-lit plaza. The Shenzhen Energy Company offices will occupy the highest floors with the rest left available as rentable office space.

ARUP and Transsolar collaborated with BIG on the project, which started construction in 2012.

 

Interior Shenzhen Energy HeadquartersPhoto: Chao Zhang.

 

Interior of the Shenzhen Energy headquartersPhoto: Chao Zhang.

Related Stories

High-rise Construction | Aug 14, 2015

Pei Cobb Freed designs ‘glass sail’ tower for Shenzhen

The 29-story tower won’t be the tallest in the city, but it will set itself apart from surrounding, glimmering towers with gently curved façades, resembling sails blown by the wind.

High-rise Construction | Aug 12, 2015

Construction begins for Kengo Kuma-designed twisted Rolex tower in Dallas

Japanese architect Kengo Kuma designs tower with gradually rotating floor plates for Rolex's new office in Dallas.

High-rise Construction | Aug 11, 2015

Calatrava's Turning Torso wins CTBUH's 10 Year Award

The 623-foot, 57-story tower was the world's first twisting skyscraper. Completed in 2005, the building, designed by Santiago Calatrava, rotates 90 degrees along its height. 

High-rise Construction | Aug 7, 2015

Tribute tower to cricket world champs will be Sri Lanka’s tallest

The 1996 Iconic Tower will be a tribute to the country’s cricket team, which won the World Cup in 1996.

Vertical Transportation | Aug 5, 2015

ThyssenKrupp’s maglev elevator test tower almost ready

The 761-foot concrete tower will enable the manufacturer to test its maglev elevator prototypes. The new elevators will be moved by magnets, allowing for vertical and horizontal movement of multiple cars in one shaft.

High-rise Construction | Aug 4, 2015

Construction of Vietnam’s tallest building commences in Ho Chi Minh City

A 1,509-foot skyscraper broke ground on the banks of the Saigon River in Ho Chi Minh City, Vietnam.

High-rise Construction | Jul 29, 2015

Jerusalem to get a high-rise pyramid by Daniel Libeskind

Are pyramids making a comeback? The city of Paris recently approved a triangle-shaped building that stirred controversy from residents. Now, the city of Jerusalem gave Libeskind's pyramid tower the go-ahead.

High-rise Construction | Jul 28, 2015

Work begins on KPF's 'flared silhouette' tower in Manhattan

The 62-story, 157-unit luxury condo tower widens at the 40th floor, resulting in a gently flared silhouette, accented by a sculpted crown.

Codes and Standards | Jul 27, 2015

New York City changing zoning rules to reduce shadows cast by high rises

For decades, the New York City’s zoning rules have made it hard to construct high-rise buildings that seem airy and minimize the shadows they cast. The city planning department is now working to change that.

High-rise Construction | Jul 20, 2015

Morphosis' Casablanca Finance City tower to be topped with crown-shaped pinnacle

The tower will anchor a new business district being planned, similar to the glass and concrete business La Défense section at the outskirts of Paris.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021