Late last month, the startup oncology company Umoja Biopharma and CRB Group, a sustainable AEC and consulting firm, started construction on the fitout of a 146,000-sf building in Louisville, Colo.
CRB, whose practices include Biotech, food and beverage, pharma, and Science + Technology, is transforming the existing building into highly flexible and scalable manufacturing, lab, office, and warehouse space. The design focuses on integrating LEED criteria and zero-carbon emissions to meet Umoja’s sustainability goals. The project is in two phases, and should be completed by October.
What makes this project different is the application of CRB’s ONEsolution delivery approach, where the firm—whose services include architecture, engineering, construction, and consultation—will take the fitout from its initial planning to operational readiness. CRB, with 18 offices in North America and two in Europe, espouses the principles of Integrated Project Delivery, and uses lean construction tools to align stakeholders on all aspects of the project.
ONEsolution is “key” to “creating a collaborative environment” with clients like Umoja, says Colton Konkak, CRB Group’s Colorado Market Team Leader, who spoke with BD+C last week about this project. He explains that the advantages of ONEsolution include early cost and scheduling certainty without any loss of design or construction integrity, “which is important for a startup.”
“Working closely with Umoja demonstrates their commitment to sustainability, diversity, equity, inclusion, creativity, and fast project delivery,” says Konkak. “These commitments and goals unified our team members and allowed us to support rapidly changing technology.”
ITS CAST INCLUDES EXPERT EXTRAS
CRB’s M.O. is to hire industy experts as needed on projects. For example, on the Umoja fitout it brought in three local subs: Impact Mechanical for MEP engineering, Kenny Electric for electrical installation, and HTI Labs for laboratory case workstations. “We aren’t bashful, either, about handing over our documents to other AEC firms, to get a second opinion,” says Konkak.
On certain other projects, CRB is dipping its toe into modularization through its SlateXpace multimodal manufacturing system that provides even greater opportunities for speed to market, cost control, and adaptability. Currently it is working with Germfree, which specializes in providing modular biopharma cleanrooms.
Related Stories
BIM and Information Technology | Sep 14, 2015
Is Apple's new iPad Pro a game changer for architects?
A stylus, split screen, and improved graphics make designing on the tablet easier.
Sponsored | Building Team | Aug 25, 2015
9 characteristics that distinguish leading A/E firms
By analyzing the “benchmark firms” selected from its annual surveys, PSMJ has identified several characteristics that distinguish top performers
Office Buildings | Aug 24, 2015
British company OpenDesk offers open-sourced office furniture
Offices can “download” their furniture to be made locally, anywhere.
Sponsored | BIM and Information Technology | Aug 20, 2015
Part II - Will BIM Work as a Deliverable? A Legal Perspective on BIM
Having the right counsel on your team can be the difference between long drawn-out negotiations and breaking new ground to meet the owner’s needs.
Sponsored | Building Team | Aug 20, 2015
Understanding the values and aspirations of millennials
A recent LinkedIn workplace survey revealed that millennials (defined as individuals aged 18–24) are quite different from boomers (those aged 55–65)
BIM and Information Technology | Aug 17, 2015
Reimagined cursors can change digital imaging
A University of Montreal professor has developed a system that elevates 2D cursors for a 3D world.
Building Team | Aug 17, 2015
One female contractor gets vocal about urging women to consider construction as a career
Doreen DiPolito of Florida’s D-Mar General Contracting thinks opportunities abound in an industry struggling with worker shortages.
Sponsored | Building Team | Aug 11, 2015
How to improve project planning
A recent research project revealed that more than 75 percent of project owners have no consistent method for assessing project risks and setting budget contingencies.
Retail Centers | Jul 27, 2015
Fish-shaped shopping mall designed for odd plot of land in China
The mall, in Qinshui, a city in China’s Shanxi province, will fit within the 250x30-meter dimensions surrounded by parallel roads and two converging rivers.
Airports | Jul 22, 2015
MUST SEE: JFK airport taps Gensler to design terminal for animals
Pets can enjoy luxurious spa and grooming services before being transported directly to their flight from the terminal.