Imagine a future in which you could access building information modeling technology anywhere, at any time. A future in which you could tap unlimited computing resources with the click of a mouse and crack even the most complex building analysis task with virtually no delay.
Imagine a future in which collaboration would be painless, integration seamless, and access to architecture, engineering, and construction expertise limitless. Finally, imagine a future where the ability to plug-and-play business partners into your project teams could be done with almost no effort.
At first, this might sound too good to be true. But just as BIM has significantly enhanced how Building Teams plan, deliver, and manage the built environment, cloud computing is now set to revolutionize BIM. According to “Sizing the Cloud,” an April 2011 research paper by Stefan Reid (published by Forrester Research), the global market for cloud computing will reach $241 billion in 2020. Clearly, cloud computing is poised to challenge traditional business models and create substantial opportunities globally for AEC firms.
Defining the cloud
The traditional approach to computing involves buying hardware—laptops, servers, routers, modems, switches, and so on—and software, then bringing in support personnel and project managers to tackle everything from integrating BIM systems to upgrading procurement tools, all under the direction of a chief information officer.
In contrast, cloud computing delivers computing as a service rather than as a physical product. Essentially, it enables AEC firms to rent computing infrastructure, software, and systems through the Internet on an as-needed basis, thereby liberating design and construction firms from much of the traditional cost and bother of IT infrastructure.
Such a setup has several unique properties that give cloud computing the capability to transform the nonresidential design and construction sector:
• Ubiquitous access — The ability to access project information and software functionality on any device, from any connected location, at any time.
• Infinite computing — The cloud is infinitely scalable, at least in terms of computing firepower that can be directed at your processing requirements. This means the traditional bottlenecks created by how much capability you can pack into a single desktop PC are now sidestepped, unleashing a whole new era of supercomputing.
• Evergreen service marketplace — The cloud is a democratic environment, enabling anyone to package up knowledge as a service and become a service provider. The recent explosion in smart phone apps is just one example. Now imagine the power of accessing the most current knowledge from across the AEC sector’s constituency.
BIM and the cloud
So, what happens when BIM processes enter the cloud? First, some of the traditional challenges that AEC firms encounter when implementing BIM are neatly sidestepped. Frequently, this occurs as a result of model collaboration, as well as the well-known limitations of desktop computing power to handle data-heavy models. “BIM enables a virtual design and construction process,” says Jonathan Mallie, principal and managing director at New York City-based SHoP Construction (www.shop-construction.com), an industry leader in integrating emerging technologies. “We see the use of cloud computing as a way to better use BIM in the VDC process.”
Second, and more significantly, BIM in the cloud helps reshape the competitive landscape across AEC, enabling any company in the supply chain to offer BIM-based services. Consider the following:
• Information collaboration — With a model located in the cloud supporting concurrent, controlled access and manipulation of all project information, the overhead associated with exchanging models and managing information integrity across the project constituency evaporates. There is one model, one version.
As project integrator, SHoP Construction is currently implementing a Web-based BIM management tool on the B2 Modular Housing Project in the Atlantic Yards in Brooklyn, N.Y. “We envision the model becoming a visual database of searchable project information, much like an Internet search engine,” says Mallie. “The Internet wouldn’t be very useful if it only had one person on it. The more stakeholders contributing to the model, the more valuable that model becomes.”
• Business collaboration — Accessing complete information through cloud-based services while more easily and effectively collaborating with new business partners on your project offers the potential to significantly improve the traditional relationship between Building Team member firms. Conversely, there’s the possibility to be a provider of that knowledge via one or more BIM services. Got a process for determining total cost of ownership for energy use or carbon analysis? Offer it as a BIM service.
Working on the Barclays Center Arena in Brooklyn, SHoP prototyped a Web-based portal to enable project stakeholders to track the fabrication and installation progress of no less than 12,000 uniquely sized steel panels for the arena’s façade. “The constantly updated 4D model evolved into a critical tool for the design-build team to understand where we were in production and how schedule changes would impact installation,” says Mallie. “What was initiated for internal use developed into a teamwide collaborative process.”
• Iteration — As BIM’s capability moves beyond the spatial processes of physical coordination into realms of the open-ended analytical, the need to undertake concurrent, exhaustive analysis across multiple dimensions (energy, carbon, whole-life cost, maintainability, etc.) continues to grow. Crunching vast amounts of data isn’t feasible in a desktop environment. Accessing the cloud’s infinite computing capabilities, however, enables Building Teams to optimize design across all constraints.
• Scalability — With the varying workload profile in the AEC environment, it can be tricky to get the size and mix of your so-called “IT estate” just right. Though a certain minimum level is always needed, the on-demand rental nature of the cloud helps you better flex along with your workload. A significant section of your hardware, software, and even support components can be more rationally aligned with your workload.
Opening new windows of opportunity
As BIM enters the cloud, the process is primed to provide efficiency and productivity benefits across the asset life cycle; it will significantly accelerate the manner in which the AEC sector plans, builds, and manages the built environment. BIM will also give rise to a range of new opportunities for AEC sector businesses to become service providers.
Five years ago, “clash detection” was a largely unknown term, while BIM was still the stuff of theory. “In the early phase of BIM, the challenge was to generate the information,” says SHoP’s Mallie. “Now, we have a great deal of data, and the true challenge is to manage and use that data most effectively. The cloud is an important tool in helping us do just that.”
Make no mistake: The AEC industry is on the cusp of a still more significant evolution with cloud computing. +
--
Dominic Thasarathar is a Senior Industry Program Manager for Construction at Autodesk, Inc.
Related Stories
Energy-Efficient Design | Apr 19, 2022
A prefab second skin can make old apartments net zero
A German startup is offering a new way for old buildings to potentially reach net-zero status: adding a prefabricated second skin.
Concrete Technology | Apr 19, 2022
SGH’s Applied Science & Research Center achieves ISO 17025 accreditation for concrete testing procedures
Simpson Gumpertz & Heger’s (SGH) Applied Science & Research Center recently received ISO/IEC17025 accreditation from the American Association for Laboratory Accreditation (A2LA) for several concrete testing methods.
Senior Living Design | Apr 19, 2022
Affordable housing for L.A. veterans and low-income seniors built on former parking lot site
The Howard and Irene Levine Senior Community, designed by KFA Architecture for Mercy Housing of California, provides badly needed housing for Los Angeles veterans and low-income seniors
Sponsored | BD+C University Course | Apr 19, 2022
Multi-story building systems and selection criteria
This course outlines the attributes, functions, benefits, limits, and acoustic qualities of composite deck slabs. It reviews the three primary types of composite systems that represent the full range of long-span composite floor systems and examines the criteria for their selection, design, and engineering.
Building Team | Apr 18, 2022
Shive-Hattery Acquires WSM Architects
Shive-Hattery announces that it has acquired WSM Architects, Inc., a 13-person architecture firm in Tucson, Arizona.
University Buildings | Apr 18, 2022
SmithGroup to design new Univ. of Colorado Denver engineering, design, computing building
The University of Colorado Denver selected SmithGroup to design a new engineering, design, and computing building that will serve as anchor of new downtown innovation district.
Building Team | Apr 15, 2022
Frank Gehry to design his largest building yet for his hometown of Toronto
Famed architect Frank Gehry will design his largest building to date for his hometown of Toronto, Canada.
Healthcare Facilities | Apr 14, 2022
Healthcare construction veteran creates next-level IPD process for hospital projects
Can integrated project delivery work without incentives for building team members? Denton Wilson thinks so.
Industrial Facilities | Apr 14, 2022
JLL's take on the race for industrial space
In the previous decade, the inventory of industrial space couldn’t keep up with demand that was driven by the dual surges of the coronavirus and online shopping. Vacancies declined and rents rose. JLL has just published a research report on this sector called “The Race for Industrial Space.” Mehtab Randhawa, JLL’s Americas Head of Industrial Research, shares the highlights of a new report on the industrial sector's growth.
High-rise Construction | Apr 14, 2022
Seattle’s high-rise convention center nears completion
The new Washington State Convention Center Summit Building—billed as the first high-rise convention center in North America—is on track to complete most of its construction later this year.